On the map
State significant development

Residential development with in-fill affordable housing 9-17 Balfour Street, Lindfield

A 9 to 10 storey, 121-home building at 9-17 Balfour Street, Lindfield

Under way: at response to submissionsHomesNeighbourhood scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 9 to 10 storey, 121-home building at 9-17 Balfour Street, Lindfield

The proponent proposes to demolish four houses at 9-17 Balfour Street, Lindfield, in the Ku-ring-gai area, and build a 9 to 10 storey residential building on a site of about 5,678.6 m². The environmental impact statement (EIS) gives 121 apartments, 28 of them affordable, a maximum height of 33.2 m, 181 parking spaces and 3 basement levels. It estimates 250 to 300 direct construction jobs. The height limit is 28.6 m, so a variation is sought. The portal describes 117 units, 24 affordable, so the figures differ. No capital investment is stated.

The Secretary's environmental assessment requirements were issued in June 2025, and the EIS is dated 19 January 2026. It drew 66 submissions: 61 objecting, 2 supporting and 3 commenting. The proponent is now preparing a response to submissions and an amendment report, and an amendment request was accepted in September 2026. The department then assesses the amended project, and the Minister decides.

Apartments (EIS)
121 dwellingsEnvironmental Impact Statement
Affordable units (EIS)
28 dwellingsEnvironmental Impact Statement
Maximum building height
33.2 mEnvironmental Impact Statement
Height limit
28.6 mEnvironmental Impact Statement
Construction jobs
250 jobsEnvironmental Impact Statement
Site area
5,678.6 m²Environmental Impact Statement
Parking
181 car spacesEnvironmental Impact Statement
Residential units (portal)
117 dwellingsPortal page

The department's description

Construction of a part-nine, part-ten storey residential flat building with in-fill affordable housing, containing basement level parking, 117 residential units, which include 24 affordable housing units.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

66 submissions: 58 from the public, 7 from organisations and 1 from public authorities

Object61
Support2
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

84 documents in 7 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2
EIS40
Exhibition2
Response to Submissions31
Agency Advice6
Amendments2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.