On the map
State significant development

Residential Flat Building with In-Fill Affordable Housing at 9-21 Beaconsfield Parade, Lindfield

399 apartments at 9-21 Beaconsfield Parade, Lindfield

Decided: approved on 13 Feb 2026HomesDistrict scale

Where it is in the process

Approved on 13 Feb 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination13 Feb 2026 (done)
  9. Approved13 Feb 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

399 apartments at 9-21 Beaconsfield Parade, Lindfield

The project is three nine to 10 storey residential flat buildings with 399 apartments, 340 market and 59 affordable, at 9-21 Beaconsfield Parade, Lindfield, in the Ku-ring-gai area. It would replace existing houses on a site of 13,386 m², with 466 car spaces in two basement levels. The estimated development cost is $270,347,051, with 150 construction jobs and 10 operational jobs.

The environmental impact statement (EIS) was exhibited from 27 May 2025 to 25 Jun 2025 and drew 22 submissions: 14 objecting, 7 supporting and 1 commenting. The proponent amended the project in November 2025, changing layouts, setbacks and unit mix. The department recommended approval, and its Director, acting for the Minister, approved it on 13 Feb 2026, with conditions. Next, the proponent must meet the conditions before work starts and during construction.

Estimated development cost
$270.3MAssessment Report
Apartments
399 dwellingsAssessment Report
Affordable apartments
59 dwellingsAssessment Report
Basement car spaces
466 car spacesAssessment Report
Construction jobs
150 jobsAssessment Report
Operational jobs
10 jobsAssessment Report
Site area
13,386 m²Assessment Report
Trees to be removed
168 treesAssessment Report

The department's description

Demolition and site preparation. Construction of a residential flat building (comprising 340 market apartments and 59 affordable housing apartments) with basement levels.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

22 submissions: 19 from the public, 2 from organisations and 1 from public authorities

Object14
Support7
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Modification 2 Lindfield - Mod 1 (Basement)SSD-81623209-Mod-2

Withdrawn: withdrawn

Alterations and additions to the consent to reflect design modifications relating to basement design, parking layout and deep soil zone

Its page on the Planning Portal

Beaconsfield Parade, Lindfield MOD 3 - Design RefinementsSSD-81623209-Mod-3

Decided: approved on 23 Oct 2026 by the department (director) · 5 submissions

The application seeks to make minor changes to the approved application including refinement of internal layouts, changes to the basement layout, and changes to the unit mix and improvements to the Building 3 entry points.

Its 43 documents

43 documents in 6 folders, each on the NSW Planning Portal

Modification Application16

See the 16 documents on the Planning Portal

Exhibition1

See the document on the Planning Portal

Response to Submissions18

See the 18 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Determination4

See the 4 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

9-21 Beaconsfield Pde MOD 1 - Basement redesignSSD-81623209-Mod-1

Decided: approved on 8 May 2026 by the department (director)

The modification application seeks consent to amend the approved drawings to reflect minor design changes to the basement levels.

Its 17 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

111 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS44
Response to Submissions36
Agency Advice6
Additional Information15
Determination4
Reports2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.