A 10 storey, 111 apartment building at Bent Street, Lindfield
Where it is in the process
Approved on 23 Dec 2025
What it proposes
AI summary. Written from this project's page and its SSD-78156462 Assessment Report and SSD-78156462 Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 10 storey, 111 apartment building at Bent Street, Lindfield
The project is a 10 storey residential flat building at 12-16 Bent Street, Lindfield, in the Ku-ring-gai area, about 220 m west of Lindfield station. It has 111 apartments, including 26 affordable apartments, and three and a half levels of basement with 145 car spaces. The estimated development cost is $81,825,363. The department's report gives the site as 4,324 m² and the building's maximum height as 33 m.
The environmental impact statement was exhibited from 24 April to 21 May 2025. It drew 12 submissions: 8 objecting, 2 supporting and 2 commenting. The proponent amended the project in October and November 2025, and the department recommended approval. A director of the department, acting for the Minister, approved it on 23 Dec 2025, with conditions. Next, the proponent must meet the conditions before construction and during it.
- Apartments
- 111 dwellingsSSD-78156462 Instrument of Consent
- Affordable housing apartments
- 26 dwellingsSSD-78156462 Instrument of Consent
- Estimated development cost
- $81.8MSSD-78156462 Assessment Report
- Car spaces
- 145 car spacesSSD-78156462 Instrument of Consent
- Site area
- 4,324 m²SSD-78156462 Assessment Report
- Operational jobs
- 3 jobsSSD-78156462 Assessment Report
The department's description
Construction of a 10 storey residential flat building with infill affordable housing and basement car parking near Lindfield Station.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
12 submissions: 10 from the public and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Bent St, Lindfield MOD 1-Minor CorrectionsSSD-78156462-Mod-1
A wording correction to the developer contributions condition for the 111-apartment Bent Street, Lindfield, building, approved on 20 Feb 2026.
The department's description
Section 4.55(1) to correct the development contributions type from 7.12 to 7.11
Its 6 documents
6 documents in 3 folders, each on the NSW Planning Portal
Modification Application3
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
107 documents in 13 folders, each on the NSW Planning Portal
Early Consultation2
Notice of Exhibition1
Request for SEARs1
EIS47
- Appendix 1 - SEARS
- Appendix 10 - Urban Design Report
- Appendix 12 - Visual Impact Assessment
- Appendix 13 - Transport Assessment
- Appendix 14 - Construction Traffic Management Plan
- Appendix 15 - Green Travel Plan
- Appendix 16 - Noise and Vibration Impact Assessment
- Appendix 17 - Civil Report - Water Management
- Appendix 18 - Stormwater Design Report
- Appendix 19 - Stormwater Drawings
- Appendix 20 - Geotechnical Investigation
- Appendix 21 - Acid Sulfate Soil Assessment
- Appendix 22 - Groundwater Quality Screening
- Appendix 23 - Salinity Assessment
- Appendix 24 - Preliminary Site Investigation
- Appendix 25 - Landscape Masterplan
- Appendix 26 - Landscape Report
- Appendix 27 - Arborist Report
- Appendix 28 - BDAR Waiver_1
- Appendix 28 - BDAR Waiver_2
- Appendix 28 - BDAR Waiver_3
- Appendix 29 ESD Report
- Appendix 3 - Title DocumentsDeposited Plan 318518
- Appendix 30 - NatHERS and BASIX Assessment
- Appendix 30 - NatHERS and BASIX Assessment_1
- Appendix 31 - Part F8 and NSW Part J Report
- Appendix 32 - Waste Management Plan
- Appendix 33 - Flood Report
- Appendix 34 - Interim ACHA
- Appendix 35 - Historical Archaeological Assessment
- Appendix 36 - Statement of Heritage Impact
- Appendix 37 - Hazardous Construction Materials Survey
- Appendix 38 - Connecting with Country Report
- Appendix 39 - Community Housing Provider Letter
- Appendix 4 - Architectural Drawings.
- Appendix 40 - Cl4.6 Variation Request
- Appendix 41 - BCA Report
- Appendix 42 - Access Report
- Appendix 43 - CPTED Report
- Appendix 44 - Ku-ring-gai DCP Assessment Table
- Appendix 5 - Survey Plan
- Appendix 6 - Design Report
- Appendix 7 - Design Verification Statement
- Appendix 8 - Infrastructure Report
- Appendix 9 - SIA and Community Engagement Table
- Application_20250416022107
- Enviornmental Impact Statement
Response to Submissions21
- Appendix C1 - Amended Architectural Plans
- Appendix C10 - DSI
- Appendix C11 - Pedestrian Wind Environment Statement
- Appendix C12 - TIA
- Appendix C13 - Clause 4.6 Variation Request
- Appendix C14 - Civil Plans
- Appendix C15 - RAP
- Appendix C16 - ESD Report
- Appendix C17 - CHP Letter of Support
- Appendix C18 - BCA Assessment Report
- Appendix C19 - Access Report
- Appendix C21 - Acoustic Assessment
- Appendix C3 - Response to SDRP & SSD
- Appendix C4 - Natural Ventilation Statement
- Appendix C5 - Landscape Response
- Appendix C6 - Updated Waste Management Plan
- Appendix C7 - Nathers and BASIX Assessment
- Appendix C8 - Arboricultural Impact Assessment
- Appendix C9 - Flood Impact Risk Assessment
- Request RTS Letter
- Response To Submissions Report
Agency Advice5
Amendments1
Additional Information18
- 12-2025 EDC Letter
- Appendix 1 - ADG Compliance Table
- Appendix 1 - Architectural Plans
- Appendix 2 - Clause 4.6 Variation Request
- Appendix 2 - Updated List of Amendments
- Appendix 2a-Updated Clause 4.6 Variation Request
- Appendix 3 - GFA Plans
- Appendix 3 - GFA Plans (Affordable)
- Appendix 3 - List of Amendments
- Appendix 4 - Statutory Compliance Table (Housing SEPP)
- Appendix 4- Statutory Compliance Table (Housing SEPP)
- Appendix 5 - ADG Compliance Table
- Appendix 5 - Redacted ACHAR
- Appendix 6 - Flood Response Letter
- Cover Letter
- Request for Additional Information
- Request for Additional Information
- SSD-7815646212 - RFI Response
Determination5
Post-determination Notices1
Reports2
Notifications1
What's near it
Where it is
- Suburb
- Lindfield
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.