Lot O - 200 Aldington Road Industrial Estate
A temperature-controlled warehouse at 200 Aldington Road, Kemps Creek
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement - Lot O 200 Aldington Road on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A temperature-controlled warehouse at 200 Aldington Road, Kemps Creek
The proponent seeks consent to build and operate a single temperature-controlled warehouse with ancillary offices on Lot O of the approved 200 Aldington Road Industrial Estate, at 106-228 Aldington Road, Kemps Creek, in the Penrith City Council area. The site is in the Mamre Road Precinct and has already been cleared and bulk earthworks done. The proposal comes with a linked change (MOD 7) to the estate's concept approval, to align the building envelope with the design. The estimated development cost is stated only as more than $50 million.
The environmental impact statement (EIS) is dated 22 Apr 2026. The case drew 3 submissions: 1 in support and 2 comments. The proponent has responded to submissions and the department is assessing the proposal with advice from other agencies. Next, the department prepares an assessment report and recommendation, and a decision follows.
- Estimated development cost (threshold stated)
- $50MEnvironmental Impact Statement - Lot O 200 Aldington Road
The department's description
Construction and operation of a single temperature-controlled warehouse with ancillary office space.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
3 submissions: 1 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
76 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS43
- Appendix A - SEARs Compliance Table
- Appendix AA - Construction Waste Management Plan
- Appendix B - Lot O Architectural Drawings
- Appendix BB - Operational Waste Management Plan
- Appendix C - Concept Plan Architectural Drawings
- Appendix CC-Bushfire Protection assessment
- Appendix D - Statutory Compliance Table
- Appendix DD - Airport Safeguarding Statement
- Appendix E - Community Engagement Table
- Appendix EE - MRP DCP Compliance Table
- Appendix F - Consolidated Mitigation Measures
- Appendix FF - CPTED Assessment
- Appendix G - EDC Cover Letter
- Appendix GG - Geotechnical and Groundwater Summary
- Appendix H - Preliminary Construction Transport Assessment
- Appendix HH - NABERS Agreement to Rate
- Appendix I - Transport Impact Assessment
- Appendix II - Construction Environmental Management Plan
- Appendix J - Civil Works Package
- Appendix JJ - Addendum Engagement Report
- Appendix K - Noise and Vibration Impact Assessment
- Appendix KK - Architectural Design Statement
- Appendix L - Stormwater Management Report
- Appendix LL - Geotechnical and Groundwater Summary Letter
- Appendix M - Erosion and Sediment Control Plan
- Appendix MM - Concept Plan Landscape Drawings
- Appendix N Aboriginal and Historical Heritage-LoA
- Appendix O - BCA Assessment Report
- Appendix P - Embodied Emissions Materials Form (NSW SEPP)
- Appendix Q - Air Quality Impact Assessment
- Appendix R - Fire Safety Strategy
- Appendix S - Lot O Landscape Drawings
- Appendix T - Resilience and Hazards Assessment
- Appendix U - Social Impact Assessment
- Appendix V - Sustainability Report
- Appendix W - Net Zero Statement
- Appendix X - Framework Sustainable Travel Plan
- Appendix Y - Utilities Statement
- Appendix Z - Visual Impact Assessment
- Application Form
- Environmental Impact Statement - Lot O 200 Aldington Road
- Music Models
- Owners Consent
Response to Submissions7
- Appendix C - Amended Stormwater Management Report
- Appendix D - Sydney Water Growth Data Form
- Appendix E - Updated Architectural Drawings
- Appendix F - Updated Sustainability Report
- Appendix G - Updated Noise and Vibration Impact Assessment
- Department's Request for Submissions Report
- Submission Report - Lot O
Agency Advice11
Additional Information11
- Additional Info_Amended MOD 7 Signage Plan
- Department's Comments on EIS
- Request for Additional Information
- Updated RTS_App.C_Amended SMR
- Updated RTS_App.D_Sydney Water Growth Data Form
- Updated RTS_App.E_Updated Architectural Drawings
- Updated RTS_App.F_Updated Sustainability Report
- Updated RTS_App.G_Updated NVIA
- Updated RTS_App.H_Modelled Noise Source Locations
- Updated RTS_App.I_Proposed Acoustic Measures
- Updated RTS_Submission Report_Lot O
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.