200 Aldington Road Industrial Estate
Where it is in the process
Approved on 5 May 2023
What it proposes
The department's description
Staged development including a Concept Proposal and Stage 1 Development Application comprising estate-wide earthworks, infrastructure and services, construction, fit-out and operation of Stage 1 warehouse building.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
19 submissions: 3 from the public, 4 from organisations and 12 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
8 changes to the project after its decision, each assessed as a case of its own, newest first.
MOD 7 - Lot O concept built form and layout adjustmentSSD-10479-Mod-7
Changes to the approved concept proposal for the 200 Aldington Road Industrial Estate, comprising amendments to the built form, gross floor area, car parking and landscaped area on Lot O, to support the proposed development under SSD-96107226.
Its 44 documents
44 documents in 2 folders, each on the NSW Planning Portal
Modification Application43
Agency Advice1
MOD 6 - Lot E concept built form adjustmentSSD-10479-Mod-6
Layout changes to the concept plan to combine Warehouse 4A and Warehouse 4B into one single building envelope with one being temperature controlled.
Its 71 documents
71 documents in 4 folders, each on the NSW Planning Portal
Modification Application35
Agency Advice8
Amendments26
Additional Information2
200 Aldington MOD 8 Amendments to Road Upgrade Works and TimingSSD-10479-Mod-8
Amendments to the approved Aldington Road upgrade works to re-locate the western leg of Intersection 4 entirely within 99–111 Aldington Road and amendments to conditions relating to the timing of operation of warehouses within the estate.
Its 18 documents
18 documents in 4 folders, each on the NSW Planning Portal
Modification Application13
- Appendix B_Amended Civil Drawings
- Appendix C_Biodiversity Addendum
- Appendix D_Intersection 4 Traffic Statement
- Appendix E_Operational Timing Traffic Statement
- Appendix F_ACHAR Letter of Advice
- Appendix G_Flood Assessment Intersection 4
- Appendix H_Environmental Investigations Review
- Appendix I_Noise, Vibration and Air Quality Review
- Appendix J_53-97 Aldington Road landowner consent
- Appendix K_Interim Road Works Subdivision Plans
- Appendix L_Ultimate Road Works Subdivision Plans
- Appendix M_Operational Traffic Management Plan
- Section 4.55(1A) Modification Application_21.08.26
Agency Advice2
Consolidated Consent1
200 Aldington Estate MOD 5 – Site AmendmentsSSD-10479-Mod-5
Changes to the approved concept proposal for the 200 Aldington Road Industrial Estate, comprising amendments to the built form on Lot K and a boundary adjustment between Lots K and G, to support the proposed warehouse development under SSD-80264236
Its 50 documents
50 documents in 5 folders, each on the NSW Planning Portal
Modification Application36
- 1040313-RPT-SY-007-Net Zero Statement - Lot K
- Appendix A Secretarys Environmental Assessment Requirements
- Appendix AA Social and Economic Assessment
- Appendix BB Waste statement
- Appendix C Public Authority Responses
- Appendix CC Waste Management Plan
- Appendix DD - Sustainability Report
- Appendix E Consolidated Mitigation Measures
- Appendix EE Infrastructure and Utilities
- Appendix F Architectural drawings and design statement
- Appendix FF Building Code of Australia and Access
- Appendix G Landscape plan
- Appendix GG Fire safety strategy
- Appendix H - Statutory and MRP DCP compliance
- Appendix HH CPTED
- Appendix I Aboriginal Cultural Heritage Assessment
- Appendix J Dangerous goods report
- Appendix K EPBC Act Protected Matters Search
- Appendix L Community Engagement Records
- Appendix M Transport statement
- Appendix N Transport impact assessment
- Appendix O Noise impact assessment
- Appendix P Construction Noise and Vibration Impact
- Appendix Q Air Quality Impact Assessment
- Appendix R Construction environmental management plan
- Appendix S Geotechnical and Groundwater Assessment
- Appendix T Civil Works Package
- Appendix U Stormwater Management report
- Appendix V Bushfire Protection Assessment
- Appendix W Historical Heritage
- Appendix Y Reslience and hazards
- Appendix Z Aviation safeguarding
- Lot K - Embodied Emissions Materials Form
- Lot K Warehouse and Modification of SSD_EIS_final 1_2
- MUS008-03-19-609 200A MOD 5 Stage 1, 2 and 3
- NABERS Executed Agreement to Rate
Additional Information7
Determination2
Consolidated Consent1
200 Aldington Estate MOD 4 - Minor Design ChangesSSD-10479-Mod-4
Modification of the detailed design of the Stage 1 building (Lot F) to meet the needs on an incoming tenant. Includes increase in floor area, addition of an 18.5m high-bay storage area and a double storey car park.
Its 42 documents
42 documents in 5 folders, each on the NSW Planning Portal
Modification Application23
- 200 Aldington Road Industrial Estate - MOD 4 Report
- A_Amended Architectural Plans (Stage+1)_Final
- B_Amended Landscape Plans (Stage 1)_Final
- C_Amended Civil Plans (Stage 1)
- D_Concept Master Plan Architectural Drawings
- E_Transport Statement
- F_Noise Impact Assessment
- G_Waste Management Plan
- H_Amended Visual Impact Assessment
- I_Air Quality Statement
- J_Aviation Safeguard Assessment
- K_Fire Safety Strategy
- L_Concept Master Plan Civil Drawings
- MUS008-01-19-609 200A Oct MOD 4 Stage 1 and 2
- M_Amended Plan of Subdivision
- Modification Application Form
- N_MOD 4 MRP DCP Compliance Table
- O_BCA and Access Report
- P_Concept Master Plan Landscape Drawings
- Q_Utility Infrastructure Statement
- S1_Contribution Catchment Plan
- S_Stormwater Management Report
- U_Community Engagement Table
Agency Advice11
Additional Information5
Determination2
Consolidated Consent1
200 Aldington Estate MOD 2 - Layout & Stage 1 WorksSSD-10479-Mod-2
Changes to the lot and building layouts under the approved concept plan to reflect proposed subsequent development stages and changes to the Stage 1 warehouse design, earthworks, road design and stormwater infrastructure.
Its 85 documents
85 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application39
- Appendix BB_Photomontages
- Appendix C_Amended Concept Architectural Drawings
- Appendix D_Amended Stage 1 Archiectural Drawings
- Appendix F_Traffic Statement for Masterplan
- Appendix G1_Traffic Statement for Stage 1
- Appendix G2_Swept Paths
- Appendix H_Civil and Stormwater Infrastructure Report
- Appendix I Heritage Statement_Redacted
- Appendix J_Air Quality Report
- Appendix K_BCA Report
- Appendix L_Bushfire Protection Assessment
- Appendix M_Amended Lot D Landscape Plans
- Appendix N_Amended Concept Civil Engineering Plans
- Appendix O_Amended Stage 1 Civil Engineering Plans
- Appendix P_Amended Concept Landscape Plans
- Appendix Q1_Amended Stage 1 Landscape Plans
- Appendix Q2_Amended Stage 1 Landscape Statement
- Appendix R_Amended Subdivion Plan
- Appendix S_Visual Impact Assessment
- Appendix T_Aviation Safeguarding Assessment
- Appendix U_Preliminary Hazard Assessment Report
- Appendix V_Sustainability Assessment
- Appendix W_Waste Management Plan
- Appendix X_Lot K Erosion and Sediment Control Report
- Appendix Y_Lot M Temporary Wetland Design
- AppendixZ_Amended Masterplan Civil Infrastructure Statement
- MUSIC Model
- Modification Report
- RFI 2 Attachment A - Biodiversity
- RFI 2 Attachment B - DCP Compliance
- RFI 2 Attachment C - Aviation Safeguarding
- RFI 2 Attachment D - Revised Flood Assessment
- RFI 2 Attachment E - Revised Noise Assessment
- RFI 2 Attachment F - Landscape Drawings
- RFI 2 Attachment G - Traffic Addendum Letter
- RFI 2 Response Letter
- Response to RFI Attachment A - Tree Canopy Cover Comparison
- Response to RFI Attachment B – DCP Table of Compliance
- Response to RFI Statement - SSD-10479-MOD2
Response to Submissions1
Agency Advice16
- Amendment advice - BCS
- Amendment advice - FRNSW
- Amendment advice - HNSW
- Amendment advice - RFS
- Amendment advice - Sydney Water
- Amendment advice PCC
- Mod report advice - BCS
- Mod report advice - DCCEEW Water Group
- Mod report advice - FRNSW
- Mod report advice - HNSW
- Mod report advice - PCC
- Mod report advice - RFS
- Mod report advice - Sydney Water
- Mod report advice - TfNSW
- Mod report advice - Transgrid
- Mod report advice - WSA
Amendments18
- 200 Aldington MOD 2 Amendment Report
- A_Architectural Plan - Concept Masterplan
- B_Architectural Plans - Stage 1
- C_Noise Impact Assessment
- D_Traffic Statement
- F_Bushfire Protection Assessment
- G_Civil Engineering Plans - Concept Masterplan
- H_Landscape Plans -Concept Masterplan
- I_Subdivision Plan
- J_MOD 2 As Amended DCP Table of Compliance
- L_Stormwater Management Report
- MUS007-03-19-609 200A June MOD 2 Stage 1 and 2
- N_Civil Infrastructure Statement
- O1_Agency Advice Response (Combined)
- O2_Landowner Response (Combined)
- P_Mod 2 RFI response matrix
- Q_Revised Visual Impact Assessment
- R_Development Sequencing Plan
Additional Information6
Determination3
Consolidated Consent1
200 Aldington Estate MOD 3 - Road UpgradesSSD-10479-Mod-3
The proposed modification seeks to amend Stage 1 of the 200 Aldington Road approval to include road widening and upgrade works to Aldington and Abbotts Road, and the upgrade of the Mamre Road and Abbotts Road intersection
Its 48 documents
48 documents in 5 folders, each on the NSW Planning Portal
Modification Application25
- A - Civil Engineering Drawings – 1000 Series Drawings
- Att B - MOD 3 Road Upgrades 200 Aldington Road
- Att C1 - Construction Noise (AARI)
- Att C2 - Construction Noise (MARIU)
- B - Civil Engineering Drawings – 2000 Series Drawings
- C - Civil Engineering Drawings – 3000 Series Drawings
- D1 - Biodiversity Development Assessment Report (AARU)
- D2 - Biodiversity Development Assessment Report (MARIU)
- E1 - Statement of Heritage Impact (AARU)
- E2 - Statement of Heritage Impact (MARIU)
- G1 - Construction Noise (AARU)
- G2 - Construction Noise (MARIU)
- H - Construction Traffic Impact Assessment
- I1 - Air Quality Impact (AARU)
- I2 - Air Quality Impact (MARIU)
- J1 - DSI (AARU)
- J2 - DSI (MARIU)
- L1 - Flood Impact Report
- Mod 3 Consultation Summary
- Mod 3 RFI Response 22 May 2024
- Modification 3 Road Upgrades 200 Aldington Road
- Modification Application_20240624033431
- N - Landscape Plans
- O - MARIU Construction Staging Plan
- Response to Stormwater Management Comments
Agency Advice7
Additional Information13
- Aldington Road Post Development PMF maps
- Archaeological Report May 2024
- Att A - Proposed Land Dedication Plan
- Att B - PCC Landowners Consent
- Att C - Flood Response
- Att C - Revised 2000 Series Civil
- Clarification of Detailed Site Investigations
- Phase 1 Abortive works plan
- RFI on Mod Report 30 July 2024
- RFI on Mod Report 30 July 2024 Attachment A
- Response to RFI- SSD-10479-MOD3 240910 F
- Revised Appendix G1 CNVIA AARU V2
- Revised Appendix G2 CNVIA MAIU V2
Consolidated Consent1
200 Aldington Estate MOD 1 - Layout & Civil WorksSSD-10479-Mod-1
Changes to the approved concept layout , earthworks and civil infrastructure, including removal of the temporary access road and changes to pad levels and retaining walls.
Its 57 documents
57 documents in 5 folders, each on the NSW Planning Portal
Modification Application33
- Appendix A _ Architectural drawings
- Appendix B - DCP Table of Compliance
- Appendix C _ Civil Drawings_Part1
- Appendix C _ Civil Drawings_Part2
- Appendix C _ Civil Drawings_Part3
- Appendix C _ Civil Drawings_Part4
- Appendix C _ Civil Drawings_Part5
- Appendix D - Biodiversity Statement
- Appendix E _ Noise Impact Assessment
- Appendix F _ Landscape drawings Part 1
- Appendix F _ Landscape drawings Part 2
- Appendix F _ Landscape drawings Part 3
- Appendix G _ Civil (Permeability)
- Appendix G _ Civil Infrastructure Statement
- Appendix H _ Flow Duration Curve Stage 1 Metrics
- Appendix H _ Stormwater Report
- Appendix I - Traffic and Transport Statement
- Appendix J - Bushfire Statement
- Appendix K _ Visual Assessment_Part1
- Appendix K _ Visual Assessment_Part10
- Appendix K _ Visual Assessment_Part2
- Appendix K _ Visual Assessment_Part3
- Appendix K _ Visual Assessment_Part4
- Appendix K _ Visual Assessment_Part5
- Appendix K _ Visual Assessment_Part6
- Appendix K _ Visual Assessment_Part7
- Appendix K _ Visual Assessment_Part8
- Appendix K _ Visual Assessment_Part9
- Appendix L _ Flood Impact Assessment
- Appendix M _ Air Quality Review Letter
- MOD 1 MUSIC modelling
- MOD 1 _ Modification Application Report
- MOD 1 _ RFI Response Letter
Agency Advice7
Additional Information14
- Acoustic Response to RFI 13.03.24
- Attachment A - Civil Engineering Drawings
- Attachment A - Civil Infrastructure Statement
- Attachment A - Noise Impact Assessment SSD-10479 MOD 1
- Attachment B - Landscape plans SSD 10-479 MOD 1
- Attachment C - BAPS Temple Site Plan
- Attachment D - Growth Servicing Data Form
- Response to RFI - 26.02.24
- Response to Request for Additional Information
- Response to Submissions 31.01.24
- SSD-10479-MOD-1 RFI 120624
- SSD-10479-MOD-1 RFI 130224
- SSD-10479-MOD-1 RFI 201223
- SSD-10479-MOD-1 RFI 260424
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
299 documents in 14 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs4
EIS44
- Appendix A - Design Statement
- Appendix A - Indicative Concept Master Plan
- Appendix A - Stage 1 Building Plans
- Appendix B - Site Survey
- Appendix C - SEARs
- Appendix D - Landscape_Part1_
- Appendix D - Landscape_Part2_
- Appendix D - Landscape_Part3_
- Appendix D - Landscape_Part4_
- Appendix E - Traffic Impact Assessment_
- Appendix F - Civil Infrastructure - Road Plans
- Appendix F - Civil Infrastructure Report
- Appendix F - Civil Infrastructure Report - Plans
- Appendix F - Civil Plan - Future Road 4
- Appendix G - Urban Design Guidelines
- Appendix H - Social and Economic Assessment
- Appendix I - Visual Impact Assessment_
- Appendix K- Historic Heritage Assessment
- Appendix L - Acoustic Impact Assessment_
- Appendix M - Contamination
- Appendix M - PSI 106-142 Aldington Road
- Appendix M - PSI 144-228 Aldington Road
- Appendix M - Supplementary 144-228 Aldington
- Appendix N - Geotechnical
- Appendix O - Waste Management
- Appendix P - Bushfire
- Appendix Q - Flood Impact Assessment_Part1
- Appendix Q - Flood Impact Assessment_Part2
- Appendix Q - Flood Impact Assessment_Part3
- Appendix Q - Flood Impact Assessment_Part4
- Appendix R - Flood Risk Assessment_Part1
- Appendix R - Flood Risk Assessment_Part2
- Appendix R - Flood Risk Assessment_Part3
- Appendix R - Flood Risk Assessment_Part4
- Appendix R - Flood Risk Assessment_Part5_
- Appendix S - NRAR Correspondence
- Appendix S - Riparian Assessment
- Appendix T - Sustainability
- Appendix U - Air Quality
- Appendix V - BCA
- Appendix W- Biodiversity Assessment Report
- Appendix X - Quantity Survey Report
- Application_20201018221202
- Environmental Impact Statement
Response to Submissions23
- Appendix A - Record and Response to Submissions_
- Appendix C - Revised Concept Masterplan_
- Appendix D - Revised VIA_Part1_
- Appendix D - Revised VIA_Part2_
- Appendix D - Revised VIA_Part3_
- Appendix D - Revised VIA_Part4_
- Appendix D - Revised VIA_Part5_
- Appendix D - Revised VIA_Part6_
- Appendix D - Revised VIA_Part7
- Appendix E - ACHAR (Redacted)
- Appendix G - Contamination Summary Letter_
- Appendix H - Preliminary Salinity Management Plan_
- Appendix I - Revised Air Quality Assessment
- Appendix J - Flooding Assessment_Part2_
- Appendix J - Flooding Assessment_Part3_
- Appendix J - Flooding Assessment_Part4_
- Appendix L - Framework Sustainable Travel Plan_
- Appendix N - Biodiversity and Riparian Addendum_
- Appendix O - Revised Urban Design Guidelines_
- Appendix P - Revised QS Report_
- Appendix Q - Archaeological Report (Redacted)
- Appendix R - Civil Report Addendum_
- Appendix S - Revised Stage 1 Building Plans_
Agency Advice34
- Additional Information advice - Sydney Water
- Additional information advice - EHG
- Additional information advice -Sydney Water 2
- Amendment Report advice - PCC
- Amendment Report advice - Sydney Water
- Amendment Report advice - TfNSW
- EIS advice - Crown Lands
- EIS advice - DPE Water
- EIS advice - DPI Agriculture
- EIS advice - EES
- EIS advice - EPA
- EIS advice - NSW RFS
- EIS advice - PCC
- EIS advice - Sydney Water
- EIS advice - TfNSW
- EIS advice - WSA
- EIS advice - WSPP
- EIS advice - WaterNSW
- RTS 2 Advice - DPIE Water
- RTS 2 Advice - EES
- RTS 2 Advice - HNSW
- RTS 2 Advice - PCC
- RTS 2 Advice - TfNSW
- RTS 2 Advice - WSPP
- RTS Advice - DPI Agriculture
- RTS Advice - EES Group
- RTS Advice - EES Group 2
- RTS Advice - Heritage NSW
- RTS Advice - Penrith City Council
- RTS Advice - TfNSW
- RTS Advice - TransGrid
- RTS Advice - Water Group and NRAR
- RTS Advice - Western Sydney Airport
- RTS Advice - Western Sydney Planning Partnership
Additional Information106
- 19-609-SKC171 - Lot F Irrigation
- 19-609-SKC172 - Northern Road Landscape Areas
- 200 Aldington Rd - Response to Submission Report 3
- 200 Aldington Rd RTS 221025
- 20141_200819_Noise Impact Assessment_BW_R8c
- 220810 SSD10479 Amending Development Report
- Aldington Abbotts Concept Stage 1 500 series-1
- Aldington Abbotts Concept Stage 1 500 series-2
- Aldington Abbotts Road Design 600 series _1
- Aldington Abbotts Road Design 600 series _2
- Aldington Abbotts Road Design 600 series _3
- Aldington Abbotts Road Design 600 series _4
- App A Section 37 Amended development summary letter
- App C Traffic and Parking Impact Memo
- App D Cumulative construction traffic Assessment Memo
- App E Noise and vibration impct memo
- App F Air quality odour impact memo
- App G Prelim development contributions assessment
- Appendix A. Agency Submissions Response
- Appendix B - MRP DCP Compliance
- Appendix J. Visual Impact Assessment (1)
- Appendix J. Visual Impact Assessment (2)
- Appendix J. Visual Impact Assessment (3)
- Appendix J. Visual Impact Assessment (4)
- Appendix J. Visual Impact Assessment (5)
- Attachment A - Civil Drawings 1000 series -_2 SSD10479
- Attachment A - Civil Drawings 1000 series -_4 SSD10479
- Attachment A - Civil Drawings 1000 series -_5 SSD10479
- Attachment A - Civil Drawings 1000 series -_6 SSD10479
- Attachment A - Revised Concept Master Plan
- Attachment B - REvised civil Lot F drawings SSD10479
- Attachment B Revised Stage 1 Plan
- Attachment C - Draft survey plan with easements SSD10479
- Attachment C - Lot Consolidation
- Attachment D - Revised architectural drawings SSD10479
- Attachmetn A - Civil Drawings 1000 series -_1 SSD10470
- Attachmetn A - Civil Drawings 1000 series -_3 SSSD10479
- Cover Letter 200 Aldington Road
- Request for Additional Information (15/11/2021)
- Request for Additional Information (18/10/22)
- Request for Additional Information (19/10/2020)
- Request for Additional Information (28/04/2021)
- Request for Additional Information (28/10/2022)
- Request for Additional Information (5/10/2021)
- Request for Additional Information 230221
- Request for Additional Information_15082022_103959
- Request for Additional Information_22082022
- SSD10479 - Final - Civil Infrastructure Report
- SSD10479 - Final Aeronautical Assessment
- SSD10479 - Final Air Quality Impact Assessment
- SSD10479 - Final Architectural Plans
- SSD10479 - Final Architectural stage 1 Plans
- SSD10479 - Final BDAR Report
- SSD10479 - Final Bushfire Assessment
- SSD10479 - Final CPTED Report
- SSD10479 - Final Civil Drawings 1000 series-2
- SSD10479 - Final Civil Drawings 1000 series-3
- SSD10479 - Final Civil Drawings 1000 series-4
- SSD10479 - Final Civil Drawings 1000 series-5
- SSD10479 - Final Civil Drawings 1000 series-6
- SSD10479 - Final Civil Drawings 1000 series_1
- SSD10479 - Final Civil Plans 150, 151, 153
- SSD10479 - Final Consolidation of lots
- SSD10479 - Final Construction EMP 1
- SSD10479 - Final Construction EMP 2
- SSD10479 - Final Construction EMP 3
- SSD10479 - Final Contamination Status Report
- SSD10479 - Final Dam Walls Stability Analysis
- SSD10479 - Final Detailed Site Investigation 1
- SSD10479 - Final Detailed Site Investigation 2
- SSD10479 - Final Detailed Site Investigation 3
- SSD10479 - Final Detailed Site Investigation 4
- SSD10479 - Final Detailed Site Investigation 5
- SSD10479 - Final Draft Construction Traffic MP
- SSD10479 - Final Draft Plan of Subdivision
- SSD10479 - Final FIA
- SSD10479 - Final Geo Investigation & Salinity Assessment
- SSD10479 - Final Hazardous materials surveys
- SSD10479 - Final Historical Heritage Assessment
- SSD10479 - Final Land use conflict risk assessment
- SSD10479 - Final Landscape Concept Master Plan_1
- SSD10479 - Final Landscape Concept Master Plan_2
- SSD10479 - Final Landscape Concept Master Plan_3
- SSD10479 - Final Letter from Transgrid
- SSD10479 - Final Lot F Civil Drawings
- SSD10479 - Final Mamre Abbotts Road Intersection Upgrade
- SSD10479 - Final Music Catchment Plan
- SSD10479 - Final Noise Assessment
- SSD10479 - Final Noise addendum
- SSD10479 - Final RTAI modelling and warrants
- SSD10479 - Final Riparian Assessment
- SSD10479 - Final Salinity Assessment
- SSD10479 - Final Samplying Analysis Plan
- SSD10479 - Final Site Investigation
- SSD10479 - Final Social Economic Impact Assessment
- SSD10479 - Final Supplementary FIA
- SSD10479 - Final Supplementary contamination investigation
- SSD10479 - Final Sustainability Assessment
- SSD10479 - Final Traffic TAMP
- SSD10479 - Final VMP
- SSD10479 - Final Waste Management Plan
- SSD10479 - Final summary of Geotechnical investigaiton
- SSD10479 - Geotech Investigation
- SSD10479 - LOO for AAR upgrade and owner consent
- SSD10479 200 Aldington - Response to RFI 200223
- Sydney Water advice 230221
Determination3
Management Plans and Strategies52
- 200 Aldington (SSD-10479)_OEMP_V0.4_20260616 - Packaged
- 200 Aldington Rd Industrial Estate CAQMP v2.1
- 250226_200 Aldington (Lot F)_Signage Strategy_v0
- A - CEMP V4.0
- AARU Phase 2_CEMP_Rev5 - Full Version
- Approval of CEMP - Phase 2 AARU
- Approval of OEMP
- Approval of OSMP
- Approval of Plan - Updated CTMP
- Approval of Plan Strategy or Study4013815
- Approval of Plan Strategy or Study_CCP
- Approval of Plan Strategy or Study_CEMP MAIU
- Approval of Plan Strategy or Study_Updated ESCP
- Attachment A - Basin A bioretention landscape plans
- B - CTMP - 200 Aldington Road
- C - ESCP_V4
- CEMP (including Appendices)
- CEMP_MAIU_Rev 08
- CTMP R8 revised
- CTMP_R9_Updated_200lv and 600hv
- D - CNVMP v1.2
- D22 PESCP Mamre Rd Intersection - DPHI Approval
- D38 - 200 Aldington CEMP Salinity Mgmt Plan_v2f
- D83 - 200A UCP V2.3
- D87 - Waste Management Plan 23-06-23
- E - CAQMP v4.0
- E2 - 200 Aldington Rd CCCHS_2.4
- ER letter approval of PESCP
- Final Community Consultation Plan
- G - FFMP
- I - Letter from ErSed
- IA OTMP- Lots F, J and K
- PESCP Rev 7 26 Nov - Lot K
- REP027-03-19-609_Operational SMP Lot F, J and K_
- SSD-10479-PA-10 Stormwater Approval
- SSD-10479-PA-11 Staging Plan approval
- SSD-10479-PA-121 IA OTMP Approval
- SSD-10479-PA-30 Updated CTMP Approval
- SSD-10479-PA-41 updated CAQMP Approval
- SSD-10479-PA-42 DNVR Approval
- SSD-10479-PA-44 - Lot F CEMP approval
- SSD-10479-PA-54 signage strategy approval
- SSD-10479-PA-7 CEMP approval
- SSD-10479-PA-9 Trunk Drainage approval
- SSD10479 D27 and 31 conditions post review combined
- SSD10479 D29 trunk drainage post review combined
- Staging Plan 19 July 23
- Stormwater Management Report_Issue 5
- TN994-01F02 200 Aldington Rd - Stage 1 (Lot F) DNVR (r3)
- Updated ESCP_ER letter
- Updated ESCP_Rev 5.1
- Updated ESCP_Rev 5.1_Memorandum
Reports6
Independent Reviews and Audits3
Notifications5
Other Documents13
- Appointment of Expert
- Appointment of Experts
- Approval letter
- Condition D54 - Noise Consultant Request
- D54 DNVR consultant approval
- DSI Dec 2022 -1
- DSI Dec 2022 -2
- DSI Dec 2022 -3
- DSI Dec 2022 -4
- Extension Requests8814246
- Request Alt ER-Elena
- SSD-10479-PA-14 Approval letter
- SSD-10479-PA-28 Approval of acoustic consultants
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.