Lake Road Battery Energy Storage System

A 400 MW battery at Lake Road, Tuggerah

Under way: at searsEnergy: batteriesDistrict scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SEARs Scoping Report - 71-77 Lake Road, Tuggerah on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery at Lake Road, Tuggerah

The proponent proposes a battery energy storage system with a capacity of about 400 MW and 1,600 MWh at 71 and 77 Lake Road, Tuggerah, in the Central Coast Council area. It would use 224 batteries in 56 blocks on a site of about 1.79 ha and connect to the existing Tuggerah substation. The estimated cost is $350 million. The site is zoned for general industry, and the nearest home is about 140 m away.

The case is at the first stage. The proponent has lodged a scoping report, dated 23 Oct 2026, and asked the department for the Secretary's environmental assessment requirements (SEARs). Next, the department issues the SEARs, the proponent prepares an environmental impact statement (EIS), and the EIS is exhibited for public submissions. No submissions have been made yet.

Estimated cost
$350MSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Power capacity
400 MWSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Storage capacity
1,600 MWhSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Battery units
224 batteriesSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Battery blocks
56 blocksSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Site area
1.79 haSEARs Scoping Report - 71-77 Lake Road, Tuggerah
Distance to nearest home
140 mSEARs Scoping Report - 71-77 Lake Road, Tuggerah

The department's description

Development of a Battery Energy Storage System with a capacity of 400 MW / 1,600 MWh and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

2 documents in 1 folder, each on the NSW Planning Portal

Request for SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.