Berkeley Vale Battery Energy Storage System
A 150 MW battery at 14 Apprentice Drive, Berkeley Vale
Where it is in the process
At exhibition, since 12 Nov 2026
Open for comment until 10 Dec 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 150 MW battery at 14 Apprentice Drive, Berkeley Vale
The proponent, acting for Ausgrid, proposes to build, operate and later decommission a battery energy storage system with a capacity of 150 MW and 300 MWh, with ancillary infrastructure. It would be at 14 Apprentice Drive, Berkeley Vale, in the Central Coast Council area, beside an existing substation. No capital investment or job numbers are stated.
The Secretary's environmental assessment requirements (SEARs) were issued in 2025. The environmental impact statement (EIS), dated 4 Nov 2026, is on exhibition from 12 Nov 2026 to 10 Dec 2026, and no submissions have been made so far. Next, the proponent responds to the submissions, often amending the project. The department then assesses it and prepares a report and recommendation before a decision is made.
- Battery power capacity
- 150 MWPortal page
- Battery storage capacity
- 300 MWhPortal page
The department's description
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 150MW/300MWh and ancillary infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
36 documents in 6 folders, each on the NSW Planning Portal
Early Consultation1
Notice of Exhibition1
Request for SEARs1
EIS21
- Appendix A - SEARs Table
- Appendix B - Site Plan
- Appendix C - Statutory Compliance Table
- Appendix D - Community Engagement Table
- Appendix E - Consolidated Mitigation Measures
- Appendix G - Community and Stakeholder Report
- Appendix H - BDAR
- Appendix I - EPBC Decision
- Appendix J - Preliminary and Detailed Site Investigation
- Appendix K - WIA
- Appendix L - Aboriginal Cultural Heritage Assessment Report
- Appendix M - NVIA
- Appendix N - TIA
- Appendix O - PHA
- Appendix O - Preliminary Hazard Assessment
- Appendix P - Bushfire Risk Assessment
- Appendix Q - Landscape and Visual Impact Assessment
- Appendix R - SEIA
- Application_20260813035138
- EDC Report Cover Letter
- Environmental Impact Statement
What's near it
Where it is
- Suburb
- Berkeley Vale
- Council area
- Central Coast
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.