Wyong Battery Energy Storage System

A 200 MW battery at 320 Pacific Highway, Wyong

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW battery at 320 Pacific Highway, Wyong

The proponent proposes a battery energy storage system with a capacity of up to 200 MW over two hours, or up to 400 MWh, at 320 Pacific Highway, Wyong, in the Central Coast Council area. It would store electricity from the grid and release it at times of high demand. The batteries would connect to the existing Wyong Zone Substation by an underground cable. The site is about 5.5 ha, and the building and operating footprint would cover about 3.8 ha. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and the scoping report is dated 20 Nov 2025. Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Battery power capacity
200 MWScoping Report
Battery storage capacity
400 MWhScoping Report
Site area
5.5 haScoping Report
Project area
3.8 haScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 200 MW/400 MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.