A 500 MW battery near Jindera, Greater Hume

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Kilnacroft Creek BESS - Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 500 MW battery near Jindera, Greater Hume

The proponent proposes to build, operate and decommission a battery energy storage system with a discharge capacity of up to 500 MW and 2,000 MWh of storage. It is at 151 Ortlipp Road, Glenellen, in the Greater Hume Shire, about 4 km north-east of Jindera town centre. It would connect to the existing Jindera Substation. The scoping report gives a project site of about 62 ha, a potential development area of about 13 ha, 150 construction jobs and 5 ongoing jobs. No capital investment is stated.

The case is at the stage of preparing an environmental impact statement (EIS). The proponent's scoping report is dated 21 Aug 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from several agencies. No submissions have been made yet. Next, the proponent prepares and lodges the EIS, which is then exhibited so the public can make submissions. The department then assesses it.

Battery power capacity
500 MWPortal page
Battery storage capacity
2,000 MWhPortal page
Construction jobs
150 jobsKilnacroft Creek BESS - Scoping Report
Ongoing jobs
5 jobsKilnacroft Creek BESS - Scoping Report
Project site area
62 haKilnacroft Creek BESS - Scoping Report
Potential development area
13 haKilnacroft Creek BESS - Scoping Report

The department's description

Construction, operation and decommissioning of a BESS with a capacity of

500 MW / 2,000 MWh and ancillary infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.