Kilnacroft Creek Battery Energy Storage System
A 500 MW battery near Jindera, Greater Hume
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Kilnacroft Creek BESS - Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 500 MW battery near Jindera, Greater Hume
The proponent proposes to build, operate and decommission a battery energy storage system with a discharge capacity of up to 500 MW and 2,000 MWh of storage. It is at 151 Ortlipp Road, Glenellen, in the Greater Hume Shire, about 4 km north-east of Jindera town centre. It would connect to the existing Jindera Substation. The scoping report gives a project site of about 62 ha, a potential development area of about 13 ha, 150 construction jobs and 5 ongoing jobs. No capital investment is stated.
The case is at the stage of preparing an environmental impact statement (EIS). The proponent's scoping report is dated 21 Aug 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from several agencies. No submissions have been made yet. Next, the proponent prepares and lodges the EIS, which is then exhibited so the public can make submissions. The department then assesses it.
- Battery power capacity
- 500 MWPortal page
- Battery storage capacity
- 2,000 MWhPortal page
- Construction jobs
- 150 jobsKilnacroft Creek BESS - Scoping Report
- Ongoing jobs
- 5 jobsKilnacroft Creek BESS - Scoping Report
- Project site area
- 62 haKilnacroft Creek BESS - Scoping Report
- Potential development area
- 13 haKilnacroft Creek BESS - Scoping Report
The department's description
Construction, operation and decommissioning of a BESS with a capacity of
500 MW / 2,000 MWh and ancillary infrastructure
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
13 documents in 3 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs1
Agency Advice11
- Advice on SEARs - CPHR
- Advice on SEARs - Crown Lands
- Advice on SEARs - DEECCW Water
- Advice on SEARs - DPIRD
- Advice on SEARs - DPIRD NSW Resources
- Advice on SEARs - FRNSW
- Advice on SEARs - Greater Hume Council
- Advice on SEARs - Heritage NSW ACH
- Advice on SEARs - RFS
- Advice on SEARs - TfNSW
- Advice on SEARs - WaterNSW
What's near it
Where it is
- Suburb
- Glenellen
- Council area
- Greater Hume Shire
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.