On the map
State significant development

Jindera Battery Energy Storage System

A 250 MW battery at Ortlipp Road, Glenellen and Jindera

Under way: at assessmentEnergy: batteriesDistrict scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 250 MW battery at Ortlipp Road, Glenellen and Jindera

The proponent seeks to build a battery energy storage system with a capacity of about 250 MW and 500 MWh at 204 Ortlipp Road, Glenellen, in the Greater Hume Shire. It would have 200 battery containers and 100 inverters, a 4 m acoustic barrier, and a 330 kV overhead line to the existing Jindera substation at 140 Ortlipp Road. About 6.48 ha of vegetation would be removed, including 2.88 ha of native vegetation. Construction is expected to take about 10 months. No capital investment is stated.

The environmental impact statement (EIS) is dated 10 Jul 2025. The proponent has since responded to submissions and lodged an amendment report, and the case is now at the stage of more information being required. There are 67 public submissions: 65 object and 2 support. Next, the proponent provides the information requested, and the department then assesses the project and makes a recommendation before it is decided.

Battery power capacity
250 MWEnvironmental Impact Statement
Battery storage capacity
500 MWhEnvironmental Impact Statement
Battery containers
200 containersEnvironmental Impact Statement
Inverters
100 invertersEnvironmental Impact Statement
Vegetation removal
6.48 haEnvironmental Impact Statement
Native vegetation removal
2.88 haEnvironmental Impact Statement
Construction duration
10 monthsEnvironmental Impact Statement
Submissions objecting
65 submissionsPortal page

The department's description

Construction, operation and decommissioning of a Battery Energy Storage System (BESS) with a capacity of 250 megawatts (MW) / 500 megawatt hours (MWh), as well as associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

67 submissions: 60 from the public and 7 from organisations

Object65
Support2
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

79 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS20
Response to Submissions9
Agency Advice37
Amendments8
Additional Information2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.