On the map
State significant infrastructure

Hunter Transmission Project

A 110 km, 500 kV transmission line from Bayswater to Olney

Decided: approved on 27 Jul 2026TransmissionRegional scale

Where it is in the process

Approved on 27 Jul 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination27 Jul 2026 (done)
  9. Approved27 Jul 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Approval on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 110 km, 500 kV transmission line from Bayswater to Olney

The Energy Corporation of NSW proposed about 110 km of new double circuit 500 kV transmission line on steel lattice towers up to 85 m high, between new switching stations at Bayswater South and Olney. It also includes upgrades to existing lines and substations, five construction support sites and three temporary worker camps for up to 900 workers. It crosses the Muswellbrook, Singleton, Cessnock, Lake Macquarie and Central Coast council areas. Up to 830 construction jobs and 10 operational jobs are expected. No capital investment is stated.

The environmental impact statement (EIS) was exhibited from 27 Aug 2025 to 24 Sep 2025 and drew 171 submissions: 111 objecting, 12 supporting and 48 commenting. The proponent amended the project after submissions. The department's assessment report of July 2026 found it approvable, and the Minister approved it on 27 Jul 2026, with conditions. Next, the proponent must meet those conditions, including management plans, before construction.

New transmission line length
110 kmAssessment Report
Maximum tower height
85 mAssessment Report
Construction jobs
830 jobsAssessment Report
Operational jobs
10 jobsAssessment Report
Development footprint
2,379 haAssessment Report
Temporary worker accommodation capacity
900 workersAssessment Report
Native vegetation affected
945 haAssessment Report

The department's description

Development of a new double circuit 500 kV overhead transmission line between the proposed substations at Bayswater and Olney State Forest, and connections from these lines to the existing 500 kV transmission network. This project is declared CSSI.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

171 submissions: 132 from the public, 35 from organisations and 4 from public authorities

Object111
Support12
Comment48

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

146 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application12
SEARs21
EIS36
Response to Submissions2
Agency Advice40
Amendments20
Additional Information11
Determination3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.