On the map
State significant development

Eraring North Battery Energy Storage System

A 500 MW battery at Rocky Point Road, Eraring

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Eraring BESS North Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 500 MW battery at Rocky Point Road, Eraring

The proponent proposes a battery energy storage system with a discharge capacity of 500 MW and an energy storage capacity of approximately 4,942 MWh, at 268 and 294 Rocky Point Road, Eraring, in the Lake Macquarie City area. It would sit on land at the Eraring Power Station, with a project footprint of approximately 22 ha, and would work alongside the existing Eraring battery. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report was prepared on 28 Sep 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued, with supplementary requirements. There are no public submissions yet. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. The department then assesses it and a decision follows.

Battery power capacity
500 MWEraring BESS North Scoping Report
Battery storage capacity
4,942 MWhEraring BESS North Scoping Report
Project footprint
22 haEraring BESS North Scoping Report

The department's description

Development of a 500 MW / 4,924 MWh battery energy storage system and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.