Hillview Wind Farm

Hillview Wind Farm with up to 55 turbines near Uralla

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Hillview Wind Farm with up to 55 turbines near Uralla

The proponent proposes a wind farm of up to 55 wind turbine generators and associated infrastructure on Hillview Road, Salisbury Plains, about 12 km east of Uralla in the Uralla Shire. The scoping report anticipates a generating capacity of 200–300 MW, depending on the turbine model chosen. The project investigation area is 6,124 ha, with a development corridor of about 2,069 ha. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The scoping report is dated November 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued. Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project, and a decision follows.

Wind turbines
55 turbinesScoping Report
Anticipated generation capacity (lower end)
200 MWScoping Report
Anticipated generation capacity (upper end)
300 MWScoping Report
Project investigation area
6,124 haScoping Report
Development corridor
2,069 haScoping Report

The department's description

The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 55 wind turbine generator and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.