State significant development

Hillview Solar Farm

A 272 MW solar farm on Hillview Road, Salisbury Plains

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Hillview Solar Farm Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 272 MW solar farm on Hillview Road, Salisbury Plains

The proponent proposes a large solar farm with a generation capacity of up to about 272 MW on Hillview Road, Salisbury Plains, about 11 km south-east of Uralla in the Uralla Shire. It would connect to the proposed Eastern Hub substation through an onsite substation. The investigation area is about 4,060 ha, and a development corridor of about 961 ha has been the focus of early studies. The final layout and capacity are still to be set. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. The scoping report is dated July 2024. No submissions have been made yet. Next, the EIS is to be exhibited so the public can make submissions, then the proponent responds and the department assesses the project.

Generation capacity
272 MWHillview Solar Farm Scoping Report
Project investigation area
4,060 haHillview Solar Farm Scoping Report
Development corridor
961 haHillview Solar Farm Scoping Report
Distance from Uralla
11 kmHillview Solar Farm Scoping Report

The department's description

Construction, operation, and decommissioning of a solar farm with a generation capacity of 272 MW, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.