Bannaby Battery Energy Storage System

A 700 MW battery on Hanworth Road, Bannaby

Under way: at exhibitionEnergy: batteriesRegional scale

Where it is in the process

At exhibition, since 18 Nov 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition18 Nov 2026 (current stage)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

Open for comment until 16 Dec 2026. Anyone can make a submission on its page on the Planning Portal.

What it proposes

AI summary. Written from this project's page and its Bannaby BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 700 MW battery on Hanworth Road, Bannaby

The proponent proposes a battery energy storage system of about 700 MW and 6,250 MWh on parts of 365, 409 and 486 Hanworth Road, Bannaby, in Upper Lachlan Shire, about 18 km east of Taralga. It includes a project substation and a 2.8 km transmission line to the existing Bannaby 500 kV substation. The battery area is about 11 ha, with a construction footprint of about 71 ha. Construction would take about 18 months with a peak workforce of around 150, and up to six people would maintain it. No capital investment is stated.

The environmental impact statement (EIS) is on exhibition from 18 Nov 2026 to 16 Dec 2026, and no submissions had been recorded. Next, the proponent responds to the submissions, and the department assesses the project and makes a recommendation before the Minister decides. The EIS says it would operate from 2029 for at least 30 years.

Battery power capacity
700 MWBannaby BESS EIS
Battery storage capacity
6,250 MWhPortal page
Transmission line length
2.8 kmBannaby BESS EIS
Peak construction workforce
150 jobsBannaby BESS EIS
Maintenance personnel
6 jobsBannaby BESS EIS
Native vegetation to be removed
45.03 haBannaby BESS EIS
Construction footprint
71 haBannaby BESS EIS
Battery operational footprint
11 haBannaby BESS EIS

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with an estimated capacity of approximately 700MW/6250MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.