200 Aldington Road Industrial Estate - Stage 2 (Lot J)
Where it is in the process
Approved on 6 May 2025
What it proposes
The department's description
Construction of three warehouses and ancillary buildings and infrastructure for warehouse and distribution use relating to the assessment, storage and distribution of vehicles
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
SSD-61212208-Mod 1 - Lot J Changes to Site LayoutSSD-61212208-Mod-1
Minor changes to the site layout including modifications to built form and building levels, vehicle racking, hail netting, internal parking and access, fencing, and landscaping.
Its 30 documents
30 documents in 5 folders, each on the NSW Planning Portal
Modification Application16
Agency Advice4
Additional Information7
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
82 documents in 11 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS35
- Appendix AA_Waste Management Plan
- Appendix A_SEARs
- Appendix BB_Fire Management Plan (1)
- Appendix B_Civil works package_optimised
- Appendix CC_LOConsent
- Appendix C_Architectural
- Appendix DD_ DG and chemical storage
- Appendix D_Landscape drawings and design statement
- Appendix E_Statutory compliance table
- Appendix F_Community engagement letter and survey
- Appendix G Estimated Development Cost_Redacted
- Appendix H_Aviation safeguarding assessment
- Appendix I_EPBC protected matters search results
- Appendix J Heritage Letter of advice__Redacted
- Appendix K_CEMP
- Appendix L _Traffic Impact Assessment
- Appendix M_Operational Noise and Vibration Impact
- Appendix N_Construction Noise and Vibration Impact
- Appendix O_Air quality assessment
- Appendix P _Table for SSD-10479 consistency V1
- Appendix Q_Social impact assessment
- Appendix R_Geotechnical and groundwater assessment
- Appendix S_Riparian assessment
- Appendix T_Stormwater management report
- Appendix U-VIA Visual Assessment Part1
- Appendix U-VIA Visual Assessment Part2
- Appendix V_Services and utilities
- Appendix W_Crime prevention through environmental design
- Appendix X_Sustainability assessment
- Appendix Y_Bushfire protection assessment
- Appendix Z_BCA Compliance Report
- Application_20240917005953
- Lot J - EMMF
- Lot J Warehouse and Distribution Centre_EIS_Final 1.0
- SFKC Lot J Kemps Creek Industrial Estate NABERS ATR opt
Response to Submissions11
- Response to RFI
- SSD-61212208 Lot J Submissions Report updated
- SSD-61212208 RTS request
- Updated Civil Works Package
- Updated EIS_v 1.1
- Updated Landscape drawings and design statement
- Updated NABERS Agreement
- Updated Operational Noise Impact Assessment
- Updated SSD-10479 consistency table
- Updated Stormwater Management Plan
- Updated Sustainability Assessment
Agency Advice12
Additional Information3
Management Plans and Strategies5
Reports7
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.