Yarrabee Solar Farm

Decided: approved on 20 Dec 2018Energy: solarRegional scale

Where it is in the process

Approved on 20 Dec 2018

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination20 Dec 2018 (done)
  8. Approved20 Dec 2018

What it proposes

The department's description

Development of a 900 megawatt solar farm with energy storage and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 1 - Battery Storage and Transport RouteSSD-9237-Mod-1

Withdrawn: withdrawn · 11 submissions

Development of a 400 MW/1,800 MWh battery storage system and transport route amendments.

Its 2 documents

2 documents in 2 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 3 - Administrative Description of LotsSSD-9237-Mod-3

Decided: approved on 22 Nov 2021 by the department (team leader)

Include an additional land parcel not listed in the EIS that is part of the approved development footprint.

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 2 – Administrative Description of LotsSSD-9237-Mod-2

Decided: approved on 17 Apr 2020 by the department (director)

Include six lots not listed in the EIS that are part of the approved development footprint.

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.