Devlins Bridge Wind Farm

A 94-turbine wind farm at Euroley, west of Narrandera

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 94-turbine wind farm at Euroley, west of Narrandera

The proponent proposes a wind farm with approximately 94 wind turbines, each with a blade tip height of approximately 290 m, plus electrical infrastructure. Its generating capacity would be approximately 680 MW. It would sit south of the Sturt Highway at Euroley, about 22 km west of Narrandera, in the Narrandera Shire, and connect to the existing Transgrid 330 kV line along its southern and western boundaries. No capital investment or job numbers are stated.

The proponent lodged a scoping report, dated 29 Sep 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from several agencies. The proponent is now preparing an environmental impact statement (EIS). When it is lodged, it is to be exhibited and the public can make submissions; none have been made yet. The Independent Planning Commission or the Minister would decide the project.

Wind turbines
94 turbinesScoping Report
Blade tip height
290 mScoping Report
Generating capacity
680 MWScoping Report
Distance west of Narrandera
22 kmScoping Report

The department's description

Construction and operation of a wind farm with up to 94 wind turbines and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.