Comet Park Battery Energy Storage System

A 150 MW battery at River Road, Yanco, near Leeton

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 150 MW battery at River Road, Yanco, near Leeton

The proponent proposes a battery energy storage system at 44 River Road, Yanco, in Leeton Shire, about 6 km south of Leeton. The portal describes a 150 MW / 600 MWh system, while the environmental impact statement (EIS) gives 650 MWh. The 4.8 ha project footprint would hold 136 battery container units and 60 inverters, and would connect to the existing Yanco Substation. The EIS gives an estimated cost of $233 million, 61 construction jobs and about 3 ongoing jobs.

The EIS is dated June 2026 and was exhibited, drawing 56 submissions: 52 objecting and 4 commenting. The case is at the response to submissions stage, where the proponent responds to the issues raised and may amend the project. The department then assesses it, with advice from other agencies. The department's assessment report and a decision follow. The decision is made by the department, the Minister or the Independent Planning Commission.

Power capacity
150 MWPortal page
Storage capacity in the portal description
600 MWhPortal page
Storage capacity in the EIS
650 MWhEnvironmental Impact Statement
Capital investment
$233MEnvironmental Impact Statement
Construction jobs
61 jobsEnvironmental Impact Statement
Ongoing operational jobs
3 jobsEnvironmental Impact Statement
Project footprint
4.8 haEnvironmental Impact Statement
Battery container units
136 unitsEnvironmental Impact Statement

The department's description

Development of a 150 MW / 600 MWh battery storage system and associated infrastructure including grid connection.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

56 submissions: 47 from the public, 8 from organisations and 1 from public authorities

Object52
Support0
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

44 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS19
Response to Submissions1
Agency Advice21

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.