On the map
State significant development

West Nyangay Solar Farm

An 800 MW solar farm with battery at Booroorban

Under way: at prepare eisEnergy: solarRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 800 MW solar farm with battery at Booroorban

The proponent proposes a solar farm of about 800 MW with a battery storage system of about 500 MW and 2,000 MWh, on the Cobb Highway at Booroorban, about 40 km south of Hay, in the Edward River Council area. The site is about 5,500 ha of undeveloped grazing land. The project would include solar arrays, inverters, internal roads, a switch yard and an office building, and would connect to a 220 kV transmission line crossing the site. The scoping report says the capital investment is greater than $30 million; no exact figure is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report was lodged in July 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued, including an amended version. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Solar capacity
800 MWScoping Report
Battery power capacity
500 MWScoping Report
Battery storage capacity
2,000 MWhScoping Report
Site area
5,500 haScoping Report
Distance south of Hay
40 kmScoping Report

The department's description

Development of a 800MW solar farm with energy storage and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Booroorban
Council area
Edward River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.