Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Romani BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW battery at Romani Road, Booroorban

The proponent proposes to build, operate and later decommission a lithium-ion battery energy storage system at 377 Romani Road, Booroorban, in the Edward River Council area, about 44 km south-west of Hay. It would have a capacity of approximately 200 MW / 800 MWh. The fenced compound, with a substation, switching station, construction area and road upgrades, would cover about 19 ha, on land mostly used for farming. It would connect to the existing 220 kV transmission line along the site's northern boundary. No capital investment or job numbers are stated.

The environmental impact statement (EIS) is dated 7 October 2025. The case is now at the stage of more information being required, and the proponent has lodged an amendment report. The public submissions number 68, all objecting. Next, the proponent responds to the department's request, and the department continues its assessment before a decision is made.

Battery power capacity
200 MWRomani BESS EIS
Battery storage capacity
800 MWhRomani BESS EIS
Development footprint
19 haRomani BESS EIS
Distance from Hay
44 kmRomani BESS EIS
Submissions objecting
68 submissionsPortal page

The department's description

The construction, operation and decommissioning of a battery energy storage system with a capacity of approximately 200MW/800MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

68 submissions: 58 from the public and 10 from organisations

Object68
Support0
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

70 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation1
Request for SEARs1
SEARs2
EIS21
Response to Submissions7
Agency Advice33
Amendments3
Additional Information1

What's near it

Where it is

Suburb
Booroorban
Council area
Edward River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.