Booroorban (Saltbush) Wind Farm

A 400 MW wind farm and 600 MW battery at Booroorban

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW wind farm and 600 MW battery at Booroorban

The proponent proposes the Saltbush Wind Farm at Wargam Road, Booroorban, in the Edward River Council area, about 43 km south of Hay by road. It would have about 70 wind turbines up to 280 m tall, with a capacity of about 400 MW. It would also have a battery energy storage system of about 600 MW and 1,200 MWh, a new substation and a switchyard connecting to Project EnergyConnect. No capital investment or job numbers are stated.

The proponent lodged a scoping report dated 30 April 2024 to ask for the Secretary's environmental assessment requirements (SEARs), and the SEARs have been issued. The proponent is now preparing an environmental impact statement (EIS). The EIS is yet to be exhibited, so there are no public submissions. After exhibition, the proponent responds to submissions and the department assesses the project and makes a recommendation before it is decided.

Wind farm capacity
400 MWScoping Report
Wind turbines
70 turbinesScoping Report
Maximum turbine height
280 mScoping Report
Battery power capacity
600 MWScoping Report
Battery storage capacity
1,200 MWhScoping Report

The department's description

Construction and operation of a 400 MW wind farm,including 70 wind turbines up to 280m in height, and a 600 MW / 1200 MWh BESS.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Booroorban
Council area
Edward River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.