On the map
State significant development

Wellington Compressed Air Energy Storage System

A 500 MW compressed air energy store near Wellington

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 500 MW compressed air energy store near Wellington

The proponent proposes a compressed air energy storage facility at 1946 Twelve Mile Road, Wellington, in the Dubbo Regional Council area. It would have a generation capacity of 500 MW and storage of up to 8,000 MWh. It would use surplus grid electricity to compress air into an underground cavern of about 1,300,000 m³, with a surface water reservoir and a connection to an existing 330 kV transmission line. The project area is 237 ha. No capital investment or job numbers are stated.

The proponent's scoping report is dated May 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. The case is at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Power capacity
500 MWScoping Report
Storage capacity
8,000 MWhScoping Report
Project area
237 haScoping Report
Underground cavern capacity
1,300,000 m³Scoping Report
Surface reservoir footprint
22 haScoping Report

The department's description

Development of a 500 MW / 8000 MWh advanced compressed air energy storage facility with associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.