Wellington Solar Farm

Decided: approved on 25 May 2018Energy: solarDistrict scale

Where it is in the process

Approved on 25 May 2018

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination25 May 2018 (done)
  9. Approved25 May 2018

What it proposes

The department's description

Development of a 174 MW solar farm and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

7 submissions: 1 from the public and 6 from organisations

Object1
Support0
Comment6

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 3 - Changes to Battery Energy Storage SystemSSD-8573-Mod-3

Under way: at prepare mod report

Increase capacity of approved battery energy storage system to 180 MW (440 MWh)

Its page on the Planning Portal

MOD 2 - Revised Project LayoutSSD-8573-Mod-2

Decided: approved on 3 Apr 2020 by the department (director)

Revised development footprint following additional geotechnical studies and detailed design.

Its 8 documents

8 documents in 4 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 1 - Substation ExtensionSSD-8573-Mod-1

Decided: approved on 11 Dec 2019 by the department (director)

Extension of the development footprint of TransGrid’s Wellington substation and locating the project connection to TransGrid Substation underground.

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.