State significant development

Wella Way Manufacturing Extension Project

Two manufacturing warehouses at Wella Way, Somersby

Under way: at prepare eisIndustry and warehousesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 76 Gindurra Rd_Somersby_Scoping Report_Final 15 Oct 25 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two manufacturing warehouses at Wella Way, Somersby

The proponent proposes to extend an existing manufacturing facility at 2 Wella Way onto the undeveloped land at 76 Gindurra Road, Somersby, in the Central Coast Council area. It would clear vegetation and build two industrial buildings joined by a covered awning, providing 31,054 m² of industrial floor space, with a new vehicle access to Kangoo Road and up to 448 car spaces. No capital investment or job numbers are stated.

The proponent's scoping report is dated 15 Oct 2025. The Secretary's environmental assessment requirements (SEARs) have been issued. The case is at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS would be exhibited and the public could make submissions. There are no submissions yet. The department would then assess the project.

Industrial floor space
31,054 m²76 Gindurra Rd_Somersby_Scoping Report_Final 15 Oct 25
Building 01 floor space
23,176 m²76 Gindurra Rd_Somersby_Scoping Report_Final 15 Oct 25
Building 02 floor space
7,878 m²76 Gindurra Rd_Somersby_Scoping Report_Final 15 Oct 25
New car parking
448 car spaces76 Gindurra Rd_Somersby_Scoping Report_Final 15 Oct 25

The department's description

Construction and operation of a two manufacturing warehouses, along with vegetation clearing, site works, vehicle access, car parking, landscaping and associated services and infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.