Somersby Energy Reserve

A 40 MW gas peaking facility at Somersby, Central Coast

Under way: at prepare eisEnergy: otherNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 40 MW gas peaking facility at Somersby, Central Coast

The proponent proposes a gas peaking facility of up to 40 MW at 64 Chivers Road, Somersby, in the Central Coast Council area, about 4.5 kilometres west of Gosford. The development footprint would be about 0.7 ha. It would connect to the Somersby substation by a power line of up to about 650 m. The scoping report expects up to 45 construction jobs at the peak and up to 2 ongoing jobs, with construction over about 9 months. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report was lodged and the Secretary's environmental assessment requirements (SEARs) have been issued. No date for the SEARs is given. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. No submissions have been made yet. The department then assesses the project and it is decided.

Generation capacity
40 MWScoping Report
Development footprint
0.7 haScoping Report
Transmission line length
650 mScoping Report
Peak construction jobs
45 jobsScoping Report
Ongoing operational jobs
2 jobsScoping Report

The department's description

Development of a 40 megawatt gas peaking facility

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

4 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.