Somersby Drill Mud and Oily Water Recycling Facility
A drill mud and oily water recycling facility, Somersby
Where it is in the process
Approved on 27 Jan 2026
What it proposes
AI summary. Written from this project's page and its SSD-62863964 Assessment Report and SSD-62863964 Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A drill mud and oily water recycling facility, Somersby
The project fits out an existing warehouse at 134 Somersby Falls Road, Somersby, in the Central Coast council area, to recycle drill mud and oily water. It could process up to 100,000 tonnes a year of drill mud and 50,000 tonnes a year of oily water. The site is 0.4 ha in an industrial area. The estimated cost is $3,096,437, with 5 construction jobs and 17 operational jobs. Works include underground tanks, a noise wall and an awning.
The environmental impact statement (EIS) was exhibited from 25 Feb 2025 to 24 Mar 2025. It drew 15 submissions: 13 in support and 2 comments. The department's assessment found water management the key issue and recommended approval. A director of the department, as the Minister's delegate, approved it on 27 Jan 2026, with conditions. Next, the proponent must meet those conditions, including noise limits and management plans, before construction and operation.
- Drill mud processed
- 100,000 tonnes a yearSSD-62863964 Assessment Report
- Oily water processed
- 50,000 tonnes a yearSSD-62863964 Assessment Report
- Estimated development cost
- $3.1MSSD-62863964 Assessment Report
- Construction jobs
- 5 jobsSSD-62863964 Assessment Report
- Operational jobs
- 17 jobsSSD-62863964 Assessment Report
- Site area
- 0.4 haSSD-62863964 Assessment Report
- Building footprint
- 1,300 m²SSD-62863964 Assessment Report
The department's description
Drill mud and oily water recycling facility located at 134 Somersby Falls Road in Somersby NSW. The proposed development will process up to 100,000 tonnes per annum of drill mud and up to 50,000 tonnes per annum of oil water.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
15 submissions: 10 from the public, 3 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Somersby Drill Mud MOD 1 - Plant Layout ChangesSSD-62863964-Mod-1
Modifications to plant layout and minor changes to waste streams and removal of a noise barrier.
Its 18 documents
18 documents in 3 folders, each on the NSW Planning Portal
Modification Application12
Agency Advice1
Additional Information5
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
74 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS29
- 1. EIS
- 10. App 9_OEMP
- 11. App 10_Consultation Report
- 12. App 11_Social Impact Assessment
- 13. App 12_SEPP 33 Screening
- 14. App 13_Pipeline Hazard Assessment
- 15. App 14_Waste Management Plan
- 16. App 15_Air Quality and Odour Impact Assessment
- 17. App 16_Greenhouse Gas Assessment
- 18. App 17_Noise and Vibration Impact Assessment
- 19. App 18_Traffic Impact Assessment
- 2. App 1_SEARs
- 20. App 19_Soil and Water Impact Assessment
- 21. App 20_Detailed Site Investigation
- 22. App 21_Geotechnical Investigation
- 23. App 22_Liquid Trade Waste Application Form
- 24. App 23_Light Spill and External Lighting
- 25. App 24_Bush Fire Assessment
- 26. App 25_Bush Fire Emergency Management
- 27. App 26_Fire Incident Management Plan
- 29. App 28_BDAR Waiver
- 3. App 2_Statutory Compliance
- 4. App 3_Mitigation Measures
- 6. App 5_10.7 Certificate
- 7. App 6_Consent CDC 5596_01
- 8. App 7_Architectural Plans
- 9. App 8_Infrastructure Management Plan
- Development Application Form
- Estimated Development Cost Report
Response to Submissions11
- Appendix A - Public Submissions Register
- Appendix C - Compliance with Planning Instruments
- Appendix D - WAE Plan
- Appendix D - WAE Survey Report
- Appendix E - Addendum to NVIA
- Appendix F - Amended Soil and Water Assess Report
- Appendix G - Amended Summary of Mitigation Measures
- Appendix H - Addendum to TIA
- Appendix I - Electrical Maximum Demand Report
- DPHI letter requesting a submissions report
- SSD-62863964 Submissions Report
Agency Advice20
- Ausgrid advice on EIS
- CPHR (formerly BCS) advice on SEARs
- Central Coast Council comment on EIS
- Central Coast Council comment on RTS
- Central Coast Council comment on SEARs
- DCCEEW LWU advice on EIS
- DCCEEW Water advice on RTS
- EPA advice on EIS
- EPA advice on RTS
- EPA advice on SEARs
- FRNSW advice on EIS
- FRNSW advice on RTS
- FRNSW advice on SEARs
- Heritage NSW advice on EIS
- Heritage NSW advice on RTS
- RFS advice on EIS
- RFS advice on RTS - no further comment
- RFS advice on SEARs
- TfNSW advice on EIS
- TfNSW advice on SEARs
Additional Information5
What's near it
Where it is
- Suburb
- Somersby
- Council area
- Central Coast
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.