Waterloo Mixed Use Development 881-885 Bourke Street
826 build-to-rent apartments at 881-885 Bourke Street, Waterloo
Where it is in the process
Approved on 21 Aug 2026
What it proposes
AI summary. Written from this project's page and its SSD-80441462 Instrument of Consent and Waterloo 881-885 Bourke St Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
826 build-to-rent apartments at 881-885 Bourke Street, Waterloo
The project is a mixed-use development across nine buildings at 881-885 Bourke Street, Waterloo, in the City of Sydney. It would provide 826 build-to-rent apartments, with commercial and retail tenancies on the ground floor, above two levels of basement parking for 426 car spaces. It has an estimated development cost of $496,735,113. It was lodged with a rezoning to change the Sydney Local Environmental Plan's height and floor space controls.
The environmental impact statement (EIS) was exhibited from 12 Nov 2025 to 25 Nov 2025. The City of Sydney Council objected to the project. The proponent submitted a submissions report on 15 Jun 2026. The portal records 68 submissions: 59 objecting, 7 supporting and 2 commenting. The department recommended approval. An Executive Director of the department, as the Minister's delegate, approved it on 21 Aug 2026, with conditions. Next, the proponent must meet the conditions, including contributions, before the first construction certificate.
- Estimated development cost
- $496.7MWaterloo 881-885 Bourke St Assessment Report
- Build-to-rent apartments
- 826 dwellingsSSD-80441462 Instrument of Consent
- Car parking spaces
- 426 car spacesSSD-80441462 Instrument of Consent
- Site area
- 21,554 m²Waterloo 881-885 Bourke St Assessment Report
- Communal open space
- 4,450 m²Waterloo 881-885 Bourke St Assessment Report
- Non-residential floor space
- 4,942 m²Waterloo 881-885 Bourke St Assessment Report
- Public submissions
- 68 submissionsPortal page
The department's description
Construction of a mixed-use development comprising approx. 850 residential apartments (BTR), affordable housing and commercial .
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
68 submissions: 60 from the public, 6 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Waterloo Mixed Use Development 881-885 Bourke Street - Modification 1 - Staged Contributions and Landscape PlansSSD-80441462-Mod-1
Amend the consent to allow for the HPC contributions to be paid on a staged basis and to correct an error in the landscaped plans stamped.
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Modification Application3
Determination3
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
157 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS67
- 0 NABERs Embodied Emissions Materials Form
- 1 Environmental Impact and Rezoning Statement
- A SEARs and Rezoning Requirements
- AA1 BCA Report Parcel 1
- AA2 BCA Report Parcel 2 and 3
- AA3 BCA Report Parcel 4
- Application_20250929060204
- B Statutory Compliance Table
- BB CHP Letter of Support
- C Mitigation Measures
- CC Site Survey
- D1 Architectural Drawings Precinct
- D2 Architectural Drawings Parcel 1
- D3 Architectural Drawings Parcel 2 and 3
- D4 Architectural Drawings Parcel 3
- D5 Architectural Drawings Parcel 4
- DD Housing Diversity Strategy
- E1 Architectural Design Report
- E2 Architectural Design Report A1 Public Domain
- E3 Architectural Design Report A2 Solar Access
- E4 Architectural Design Report A3 Areas
- E5 Architectural Design Report A4 ADG Compliance
- E6 Architectural Design Report A5 SDRP Response Schedule
- EE1 Section J Compliance
- EE2 NatHERS Certificate
- EE3 BASIX Certificate Stage 1
- EE4 BASIX Certificate Stage 2
- EE5 Stamped Drawings Parcel 1
- EE6 Stamped Drawings Parcel 2 and 3
- EE7 Stamped Drawings Parcel 3
- EE8 Stamped Drawings Parcel 4
- EE9 ESD Addendum Letter Rev A
- F1 Visual Impact Assessment
- F2 Visual Impact Assessment Methodology
- FF Statement of Heritage Impact
- G Transport Impact Assessment_Updated_21Oct25
- GG Connecting with Country Report
- H Noise and Vibration Impact Assessment
- HH Engagement Report
- I Groundwater Assessment
- II Soil Salinity Assessment
- J Geotechnical Report
- JJ LEP Maps
- K Status of Remediation Statement
- KK Services Utilites Report
- L Acid Sulfate Soil Assessment
- LL Construction Traffic Management Plan
- M1 Landscape Plans Parcel 1
- M2 Landscape Plans Parcel 2 and 3
- M3 Landscape Plans Parcel 4
- MM Alternate Design Excellence Strategy
- N Social Infrastructure Assessment
- NN Desktop ACHAR
- O1 Arborist Impact Assessment
- O2 Arborist Impact Assessment Plans
- P ESD Report
- Q BDAR Waiver Approval Letter
- R Construction Waste Management Plan
- S1 Operational Waste Management Plan Parcel 1 and 4
- S2 Operational Waste Management Plan Parcel 2 and 3
- T Social Impact Scoping Study
- U Flood Impact Risk Assessment
- V Preliminary Public Art Plan
- W Aviation Assessment
- X Pedestrian Wind Environment Study
- Y Integrated Water Management Report
- Z_Accessibility Statement_Updated
Response to Submissions33
- 0_Response to Submissions Report_12June26
- Appendix A - Response to Submissions Table V2
- Appendix B - Revised Mitigation Measures
- Appendix C - Response to SDRP Comments V2
- Appendix D - Architectural Drawings - Parcel 1
- Appendix D - Architectural Drawings - Parcel 3
- Appendix D - Architectural Drawings - Parcel 4
- Appendix D - Architectural Drawings Precinct Elevations V2
- Appendix D - Architectural Drawings Precinct V2
- Appendix D - Revised Architectural Drawings - Parcel 2-3
- Appendix D - Revised Architectural Drawings - TFA
- Appendix E - Design Report Addendum - Parcel 1-4 V2
- Appendix E - Revised Design Report Addendum - Parcel 2-3
- Appendix E - Revised Development Summary Sheet
- Appendix F - Pedestrian Wind Envronment Study V2
- Appendix G - OWMP Parcel 1-4 V2
- Appendix G - Operational Waste Management Plan Parcel 2-3
- Appendix H - Revised Transport Impact Assessment
- Appendix I - Revised Flood Impact Risk Assessment V2
- Appendix J - Flood Emergency Response Plan V2
- Appendix K - Noise and Vibration Impact Assessment V2
- Appendix L - IWM Report - Civil Plans
- Appendix M - Landscape Plans Lot 2-3 Part 2
- Appendix M - Landscape Plans Lot 2-3_Part 1
- Appendix M - Revised Landscape Plans - Parcel 1
- Appendix M - Revised Landscape Plans - Parcel 4
- Appendix N - BCA Report - Parcel 1 - 4 V2
- Appendix N - BCA Report - Parcel 2 - 3 V2
- Appendix O - Revised Accessibility Compliance Report V2
- Appendix P - Revised Groundwater Assessment V2
- Appendix Q - Revised Public Art Plan V2
- Appendix R - Revised Market Demand Study
- Request RTS Letter
Agency Advice17
- Ausgrid - Advice on EIS
- CPHR EIS Advice - (SSD-80441462)
- City of Sydney - Submission on EIS
- Council feedback on RtS
- DCCEEW Water - Advice on EIS
- DCCEEW Water - Advice on RtS
- EPA - Advice on EIS
- EPA - Advice on RtS
- Fire and Rescue NSW - Advice on EIS
- Heritage NSW - Advice on EIS
- Heritage NSW - Advice on RtS
- NSW SES - Advice on EIS
- NSW SES - Advice on RtS
- Sydney Water - Advice on SEARs
- Sydney Water - Advice on SEARs (addendum)
- TfNSW - Advice on EIS
- TfNSW - Advice on RtS
Additional Information20
- 27 July 2026_Response to Submissions Letter SSD-80441462
- B - Revised Precinct Plans
- C – Revised Basement Plans (Parcel 2 & 3)
- D - Revised TFA Drawings (Parcel 1 & 4)
- D - Revised TFA Drawings (Parcel 2 & 3)
- E - Architectural Solar Studies
- F – Appendix to Waste Management Statement
- G – Revised Flood Emergency Response Plan
- H – Appendix to Noise and Vibration Impact Assessment
- I – Cross Ventilation Strategy (Parcel 1 & 4)
- J – Cross Ventilation Strategy (Building 2B)
- K - Ollo Bikeshare Letter
- L - Tree Canopy Plan (Parcel 1)
- L - Tree Canopy Plan (Parcel 4)
- M – Loading Dock Concept Plan
- N - Interim Waste Collection Diagrams
- O – SDRP Letter 1
- O – SDRP Letter 2
- Request for Additional Information 2
- Request for Information
Determination13
- Approved M1 Landscape Plans Parcel 1
- Approved M2 Landscape Plans Parcel 2 and 3
- Approved M3 Landscape Plans Parcel 4
- Approved TFA Drawings (Parcel 1 and 4)
- Approved TFA Drawings (Parcel 2 and 3)
- Architectural Drawings - Parcel 1 (SJB)
- Architectural Drawings - Parcel 2-3 (Bates Smart)
- Architectural Drawings Precinct
- Drawings - Parcel 3 (Chenchow Little)
- Drawings - Parcel 4 (Curious Practice)
- SSD Notice of Decision
- SSD-80441462 Instrument of Consent
- Waterloo 881-885 Bourke St Assessment Report
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.