600-660 Elizabeth Street, Redfern - Mixed Use
Where it is in the process
Approved on 24 Sep 2025
What it proposes
The department's description
Four new buildings providing housing including social and affordable housing, a community facility, and retail/commercial space
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
24 submissions: 20 from the public, 3 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
600-660 Elizabeth Street, Redfern MOD 1 - Design and administrative changesSSD-51274973-Mod-1
Design development changes and changes to conditions
Its 24 documents
24 documents in 5 folders, each on the NSW Planning Portal
Modification Application12
- Appendix A - Architectural Plans (Pt 1)
- Appendix A - Architectural Plans (Pt 2)
- Appendix A - Architectural Plans (Pt 3)
- Appendix A - Architectural Plans (Pt 4)
- Appendix A - Architectural Plans (Pt 5)
- Appendix B - Design Report
- Appendix C - Landscape Plans
- Appendix D - Landscape Report_Aspect
- Appendix E - Transport Statement_Ason
- Appendix F - Wind Report_Windtech
- Modification amendment letter_Final
- s4.55 Modification Letter
Agency Advice1
Additional Information4
Determination6
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
157 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
EIS75
- AA_Stormwater Report_
- A_Architectural Drawings_Building S1_
- A_Architectural Drawings_Building S2_
- A_Architectural Drawings_Building S3_
- A_Architectural Drawings_Building S4_
- A_Architectural Drawings_Full Site_
- Application_20240806060640
- BB1_PCYC Hazardous Building Materials Survey_December 2019_
- BB2_PCYC Asbestos Assessment_December 2022_
- B_Design Report+Verification_Part 1 Oct
- B_Design Report+Verification_Part 2-3 Oct
- B_Design Report+Verification_Part 4 Oct
- B_Design Report+Verification_Part 5 Oct
- B_Design Report+Verification_Part 6-7 Oct
- B_Design Report+Verification_Part 8 Oct
- C1_Landscape Design Report_
- C1_Landscape Plans_
- CC1_ACHAR cover letter_
- CC2_ACHAR
- DD_Statement of Heritage Impact_
- D_Site Survey_
- EE1_Historical Archaeological Assessment cover letter_
- EE2_Historical Archaeological Report_
- EE3_Post-Archaeological Excavation Report_
- E_Clause 4.6 Variation - Building Height Oct
- Environmental Impact Statement
- FF_Waste Management Plan_
- F_Clause 4.6 Variation - FSR Oct
- GG_Operational Waste Management Plan_
- G_SEARs Compliance Table_
- HH1_Ecologically Sustainable Development
- HH2_BASIX and NatHERS Report and Plans_
- H_Statutory Compliance Table_
- II_Crime Prevention Through Environmental Design Report_
- I_Mitigation Measures_
- JJ1_Dewatering Management Plan_
- JJ2_Groundwater Monitoring Report_
- J_Design Guide Compliance Assessment Oct
- K0_Design Excellence Process Summary Report_
- K1_Design Excellence Strategy_
- K2_S2 Design Competition Report_
- K3_S1 Expression of Interest Summary Report_
- K4_Design Review Panel Terms of Reference_
- K5_Design Review Panel Advice_
- KK_BCA Report_
- LL_Accessibility Report_
- L_Connecting with Country Report_Part1_
- L_Connecting with Country Report_Part2_
- M1_BDAR Waiver Request_
- M2_BDAR Waiver_
- M3_BDAR Waiver Determination_
- MM_Infrastructure and Utilities Management Plan_
- NN_Civil Engineering Plans_
- N_Consultation Outcomes Report_
- OO_Staging Plans_
- O_Social Impact Assessment_
- Owners consent
- PP_EDC Cover Letter Oct
- P_Visual Impact Assessment Oct
- Q_Pedestrian Wind Environmental Assessment_
- R_Transport Assessment_
- S_Noise and Vibration Impact Assessment_
- T_Acid Sulfate Soils Management Plan_
- U_Phase 1 ESA and Geotechnical Desktop Study_Part1_
- U_Phase 1 ESA and Geotechnical Desktop Study_Part2_
- U_Phase 1 ESA and Geotechnical Desktop Study_Part3_
- V_Stage 2 Contamination Assessment_
- W1_Site Auditors Advice_
- W2_Remediation Action Plan_Part1_
- W2_Remediation Action Plan_Part2_
- W2_Remediation Action Plan_Part3_
- X_Geotechnical Investigation Report_
- Y_Arboricultural Impact Assessment Oct
- Z_Flood Assessment_Part1_
- Z_Flood Assessment_Part2_
Response to Submissions38
- A - Submissions Register
- B - Updated Mitigation Measures
- C - Precinct - Clouded Consolidated Updated Plans
- C - S1 - Clouded Consolidated Updated Architectural Plans
- C - S2 - Clouded Consolidated Updated Architectural Plans
- C - S3 - Clouded Consolidated Updated Architectural Plans
- C - S4 - Clouded Consolidated Updated Architectural Plans
- D - Precinct - Clean Consolidated Updated Plans
- D - S1 - Clean Consolidated Updated Architectural Plans
- D - S2 - Clean Consolidated Updated Architectural Plans
- D - S3 - Clean Consolidated Updated Architectural Plans
- D - S4 - Clean Consolidated Updated Architectural Plans
- E - Design Report Addendum
- F - Clouded Consolidated Updated Landscape Plans
- G - Clean Consolidated Updated Landscape Plans
- H - Landscape Design Report Addendum
- I - Updated Civil Plans
- J - Updated Stormwater Report
- K - Updated Flood Assessment Report
- L - Residential - Flood Emergency Response Plan
- L - S1 PCYC - Flood Emergency Response Plan
- L - S4 Ground Floor - Flood Emergency Response Plan
- M - Draft Letter of Public Benefit Offer
- N - Pt 1 Updated Remediation Action Plan
- N - Pt 2 Updated Remediation Action Plan
- N - Pt 3 Updated Remediation Action Plan
- N - Updated Remediation Action Plan Endorsement
- O - Updated BDAR Waiver Request
- P - Updated Pedestrian Wind Environment Study
- Q - Updated Operational Waste Management Plan
- R - Transport Letter
- Redfern Place - Submissions Report
- S - Updated Noise and Vibration Impact Assessment
- T - Arborist Review Letter
- U - Design Review Panel #5 Advice
- V - Historical Archaeological Research Design
- W - Aboriginal Archaeological Test Excavation Report
- X - Heritage NSW Correspondence on ACHAR
Agency Advice17
Additional Information9
- 1_Response to RFI_26Jun25
- Attachment A - Updated Civil Plans
- Attachment B - Updated Shadow Models
- Attachment C - Scaled GFA plans
- Attachment D - Bin Path of Travel to Collection Points
- Attachment E - Updated Basement Plan
- Attachment F - Flood Tank to Pit Long Section
- Redfern Place - Letter of Offer
- S1.A02.02-S1 PLAN - LEVEL 2 _ ROOF_CLEAN
Determination10
- Assessment Report - 600-660 Elizabeth Street Redfern
- Instrument - 600-660 Elizabeth Street Redfern
- Notice of Decision - 600-660 Elizabeth Street Redfern
- Stamped Building S1 Plans
- Stamped Building S2 Plans
- Stamped Building S3 Plans
- Stamped Building S4 Plans
- Stamped Civil Plans
- Stamped Landscape Plans
- Stamped Precinct Plans
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.