Waterloo Metro Quarter - Northern Precinct
Two residential towers at Waterloo Metro Quarter Northern Precinct
Where it is in the process
Approved on 25 Jun 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report and Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Two residential towers at Waterloo Metro Quarter Northern Precinct
The project is the detailed design of two residential towers above a commercial podium, over the Waterloo Metro Station at 150 Cope Street, Waterloo, in the City of Sydney. Building 1A has 27 storeys and Building 1B has 24 storeys. It has 275 market homes and 39 affordable homes, and a total of 32,517 m² of gross floor area. The estimated development cost is $184,577,648. It also has a public walkway, Raglan Walk.
The environmental impact statement (EIS) was exhibited from 27 Nov 2025 to 15 Jan 2026 and drew 8 submissions: 1 objecting, 2 supporting and 5 commenting. The proponent responded on 13 Mar 2026. The department recommended approval, and a director of the department, acting for the Minister, approved it on 25 Jun 2026, with conditions. Next, the proponent must meet the conditions, including before the first construction certificate is issued.
- Estimated development cost
- $184.6MAssessment Report
- Market dwellings
- 275 dwellingsDevelopment Consent
- Affordable dwellings
- 39 dwellingsDevelopment Consent
- Maximum gross floor area
- 32,517 m²Development Consent
- Building 1A height
- 27 storeysDevelopment Consent
- Building 1B height
- 24 storeysDevelopment Consent
- Office floor space
- 4,871 m²Assessment Report
The department's description
Amending application for two residential towers.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
8 submissions: 4 from the public, 2 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
88 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS43
- Appendix A - SEARs Requirements Table
- Appendix AA - Services and Utilities Infrastructure Report
- Appendix B - Updated Design Excellence Strategy
- Appendix BB - Social Impact Assessment
- Appendix C - Design Integrity Report
- Appendix CC - Construction Environmental Management Plan
- Appendix DD - Engagement Report
- Appendix E - Architectural Drawings
- Appendix EE - BDAR Waiver
- Appendix F - Architectural Design Report
- Appendix FF - Security Risk Assessment
- Appendix G Site Survey
- Appendix GG - Structural Report
- Appendix H - BCA and DDA Assessment Report
- Appendix HH - Subdivision Plans
- Appendix I - Pedestrian Wind Environmental Report
- Appendix II - Statutory Compliance Table
- Appendix J - Overshadowing
- Appendix JJ - Mitigation Measures Table - Northern
- Appendix K - Reflectivity
- Appendix KK - Economic Impact Assessment
- Appendix L - Solar Access
- Appendix LL - Consistency with the Concept Approvals
- Appendix M - Natural Ventilation Report
- Appendix MM - Clause 4.6 Northern and Central
- Appendix N - Visual Impact Assessment Report
- Appendix O - Landscape & Public Domain Drawings
- Appendix O - Landscape & Public Domain Report
- Appendix P - CPTED Report
- Appendix Q ESD Report
- Appendix R - Freight Servicing Management Plan (2)
- Appendix R - Green Travel Plan (2)
- Appendix R - TTPIA
- Appendix S - CTMP (2)
- Appendix T - Noise and Vibration Impact Assessment
- Appendix U - Geotechnical Interpretive Report (2)
- Appendix V - Water Management Report
- Appendix W - Flood Impact Assessment
- Appendix X - Waste Management Plan (3)
- Appendix Y - Heritage Interpretation Strategy
- Appendix Z - Statement of Archaeological Impact
- Environmental Impact Statement - Northern Precinct
- _Appendix D Estimated Development Cost Report
Response to Submissions16
- Appendix A - Submissions Register
- Appendix B - Supplementary Design Report
- Appendix C - Updated Architectural Drawings
- Appendix D - Civil Engineering Memo
- Appendix E - Traffic Engineering Memo
- Appendix F - Wind Engineering Memo
- Appendix G - Supplementary Landscape Design Response
- Appendix H - Community Housing Provider Letter
- Appendix I - Flood Risk Memo
- Appendix J - Fire Engineering Statement
- Appendix K - Clause 4.6 Variation
- Appendix L - Revised Statutory Compliance Table
- Appendix M - Mitigation Measures
- Appendix N - Connecting with Country Guidelines
- Request RTS Letter - SSD-79307758
- Submissions Report
Agency Advice11
Additional Information4
Determination8
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.