Waterloo Metro Quarter - Central Precinct
A 24 storey co-living tower at 150 Cope Street, Waterloo
Where it is in the process
Approved on 9 Jul 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report and Development Consent on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 24 storey co-living tower at 150 Cope Street, Waterloo
The project is a 24 storey tower known as Building 2, above a podium, in the Waterloo Metro Quarter at 150 Cope Street, Waterloo, in the City of Sydney. It would hold 500 co-living rooms, up to 17,440 m² of gross floor area, and community facility space including a not-for-profit childcare centre. It also includes public spaces such as Grit Lane and Grit Square. The portal calls it a student housing tower, but the consent describes co-living housing. The estimated development cost is $112,811,180.
The environmental impact statement was exhibited from 27 Nov 2025 and drew 7 submissions: 3 objecting, 1 supporting and 3 commenting. The proponent responded on 13 Mar 2026. A director of the department, acting for the Minister, approved it on 9 Jul 2026, with conditions. Next, the proponent must meet those conditions before and during construction.
- Estimated development cost
- $112.8MAssessment Report
- Co-living rooms
- 500 roomsDevelopment Consent
- Tower height
- 24 storeysDevelopment Consent
- Maximum gross floor area
- 17,440 m²Development Consent
- Minimum community facility floor area
- 2,000 m²Development Consent
- Childcare centre floor area
- 2,254 m²Assessment Report
The department's description
Amending application for a 24 storey student housing tower.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
7 submissions: 3 from the public, 2 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
94 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS45
- Appendix A - SEARs Requirements Table (4)
- Appendix AA - Services and Utilities Report
- Appendix B - Updated Design Excellence Strategy (1)
- Appendix BB - Social Impact Assessment
- Appendix C - Design Integrity Report
- Appendix CC - CEMP
- Appendix D EDC Report
- Appendix DD - Engagement Report (1)
- Appendix E - Architectural Drawings (1)
- Appendix EE - BDAR Waiver (1)
- Appendix F - Architectural Design Report (1)
- Appendix FF - Security Risk Assessment (1)
- Appendix G Site Survey Plan
- Appendix GG - Structural Report (1)
- Appendix H - BCA and DDA Report (1)
- Appendix HH - Subdivision Plans
- Appendix I - Wind Report
- Appendix II - Statutory Compliance Table (3)
- Appendix J - Overshadowing (1)
- Appendix JJ - Mitigation Measures Table
- Appendix K - Reflectivity (1)
- Appendix KK - Economic Impact Assessment
- Appendix L - Solar Access
- Appendix LL - Consistency with Concept Approval (1)
- Appendix MM - Clause 4.6 Request
- Appendix N - VIA
- Appendix N - Visual Impact Assessment Report
- Appendix NN - Childcare Assessment
- Appendix O - Landscape & PD Drawings
- Appendix O - Landscape & PD Report (1)
- Appendix P - CPTED Report (3)
- Appendix Q ESD Report
- Appendix R - Freight Servicing Management Plan (1)
- Appendix R - Green Travel Plan (1)
- Appendix R - TTPIA
- Appendix S - CTMP (1)
- Appendix T - Noise and Vibration Impact Assessment (1)
- Appendix U - Geotechnical Interpretive Report (1)
- Appendix V - Water Management Report (1)
- Appendix W - Flood Impact Assessment (2)
- Appendix X - Waste Management Plan (2)
- Appendix Y - Heritage Impact Statement (2)
- Appendix Y - Heritage Interpretation Strategy
- Appendix Z - Statement of Archaeological Impact (1)
- Waterloo Metro Quarter OSD - central precinct - EIS
Response to Submissions14
- Appendix A - Submissions Register
- Appendix B - Supplementary Design Report
- Appendix C - Civil Engineering Memo
- Appendix D - Traffic Engineering Memo
- Appendix E - Wind Engineering Memo
- Appendix F- Flood Risk Memo
- Appendix G - Fire Engineering Letter
- Appendix H - Clause 4.6 Variation
- Appendix I- Revised Statutory Compliance Table
- Appendix J - Mitigation Measures Table
- Appendix K - Updated Landscape plan
- Appendix L - Connecting with Country Guidelines - Murawin
- Request RTS Letter- SSD-79307746
- Submissions Report - central precinct
Agency Advice13
Additional Information10
- 01. Notice of Modification - SSD-9393
- 02. Updated Appendix LL - Consistency with Concept Approval
- 03. Updated draft Stratum Subdivision Plan
- Appendix A - Child Care Review Report
- Appendix B - Child Care Flood Emergency Response
- Appendix C - Child Care Flood Addendum
- RFI - Waterloo Metro Quarter Central Precinct SSD-79307746
- Request RFI Letter WMQ Central Precinct SSD-79307746
- Response to RFI WMQ Central Precinct
- Response to RFI_WMQ Central Precinct_May 2026
Determination6
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.