Part 3A project

Wagga Wagga Hospital - Stage 1

Stage 1 of the Wagga Wagga Hospital, Edward Street

Decided: approved on 15 May 2012HealthDistrict scale

Where it is in the process

Approved on 15 May 2012

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination15 May 2012 (done)
  10. Approved15 May 2012

What it proposes

AI summary. Written from this project's page and its Approval Instrument.pdf and Director General's Assessment Report.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Stage 1 of the Wagga Wagga Hospital, Edward Street

This is stage 1 of the Wagga Wagga Hospital, proposed at 260-280 Edward Street, Wagga Wagga, in the Wagga Wagga City Council area. It was assessed under the former Part 3A of the planning law, which let the department assess major projects. The proponent's environmental assessment included site plans, floor area drawings, landscape plans, shadow diagrams, and flood impact, heritage and archaeological studies, plus a construction management plan. No capital investment, floor area or number of beds is stated.

Director-General's requirements were issued, and the Heritage Council, NSW Transport (RMS) and Wagga Wagga City Council made submissions. The portal records no public submission count. The proponent responded in March 2012 with final plans and a project report. The department's Deputy Director-General approved the project on 15 May 2012. Next, the proponent must meet the conditions of the approval, and the project could later be modified.

The portal gives no description.

Modifications

2 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 2 - Timing Lot AmalgamationMP11_0087-Mod-2

Decided: approved with conditions on 20 Nov 2013 by Dir(Metro/Reg-N)

Its 3 documents

3 documents in 2 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Design ChangesMP11_0087-Mod-1

Decided: approved with conditions on 2 Nov 2012 by Dir(Metro/Reg-S)

Its 47 documents

47 documents in 3 folders, each on the NSW Planning Portal

Application43

See the 43 documents on the Planning Portal

Agency Submissions2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

68 documents in 6 folders, each on the NSW Planning Portal

Application52
Request for DGRS2
EA4
Submissions3
Response to Submissions4
Determination3