On the map
State significant development

Vales Point Battery Energy Storage System

A 400 MW battery at Vales Point Power Station, Mannering Park

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery at Vales Point Power Station, Mannering Park

The proponent proposes a battery energy storage system with a capacity of 400 MW and 800 MWh at 200 Vales Road, Mannering Park, in the Central Coast Council area. It would sit wholly within the existing Vales Point Power Station site, about 1 km south-east of the Mannering Park town centre. It would connect to the existing Vales Point 330 kV substation next to the site. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report dated August 2025 was lodged, and the Secretary's environmental assessment requirements (SEARs) have been issued. Next, the proponent lodges the EIS, which is then exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Battery power capacity
400 MWScoping Report
Battery storage capacity
800 MWhScoping Report

The department's description

Construction, operation and decommissioning of a 400 MW/800 MWh battery energy storage system (BESS) and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.