On the map
State significant development

Sunshine Estate Battery Energy Storage System

A 120 MW battery at Wine Country Drive, Rothbury

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW battery at Wine Country Drive, Rothbury

The proponent proposes to build, operate and decommission a battery energy storage system with a capacity of 120 MW / 480 MWh, with associated infrastructure, at 1337 Wine Country Drive, Rothbury, in the Cessnock City Council area. The environmental impact statement (EIS) lists a noise wall, a substation and switch room, operation and maintenance buildings, and a proposed subdivision. No capital investment or job numbers are stated.

The EIS is dated April 2026 and was exhibited. It drew 42 submissions: 40 objecting, 1 supporting and 1 commenting. The project is now at the response to submissions stage, where the department has asked the proponent to respond to the issues raised, and it may amend the project. Next, the department assesses the project with advice from other agencies. It then issues an assessment report and the project is determined.

Battery power capacity
120 MWPortal page
Battery storage capacity
480 MWhPortal page
Public submissions
42 submissionsPortal page
Submissions objecting
40 submissionsPortal page

The department's description

Construction, operation and decommissioning of a 120 MW / 480 MWh battery energy storage system (BESS) and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

42 submissions: 33 from the public, 8 from organisations and 1 from public authorities

Object40
Support1
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

45 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS14
Response to Submissions1
Agency Advice26

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.