Rothbury Battery Energy Storage System

A 135 MW battery at 1309 Wine Country Drive, Rothbury

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 135 MW battery at 1309 Wine Country Drive, Rothbury

The proponent proposes to build and operate a battery energy storage system with a capacity of 135 MW and 540 MWh, with associated infrastructure, at 1309 Wine Country Drive, Rothbury, in the Cessnock City Council area. The site is on land within Lots 1 and 2 of DP 1318566. No capital investment, jobs or site area is stated in the pages of the environmental impact statement (EIS) that were read.

The EIS is dated 20 Apr 2026 and has been exhibited. It drew 70 public submissions: 65 objecting, 2 supporting and 3 commenting. The case is at the response to submissions stage, where the proponent answers the issues raised and may amend the project. Next, the department assesses the project with advice from other agencies, then writes an assessment report and the project is determined.

Battery power capacity
135 MWPortal page
Battery storage capacity
540 MWhPortal page
Public submissions
70 submissionsPortal page
Submissions objecting
65 submissionsPortal page

The department's description

Construction and operation of a 135MW/540MWh BESS and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

70 submissions: 58 from the public, 11 from organisations and 1 from public authorities

Object65
Support2
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.