On the map
State significant development

Springhill Battery Energy Storage System

A 100 MW battery on Five Islands Road, Unanderra

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Springhill Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery on Five Islands Road, Unanderra

The proponent proposes a battery energy storage system of up to 100 MW and 200 MWh at 191-195 Five Islands Road, Unanderra, in the City of Wollongong. It would use 40 battery units on a 0.71 ha site beside the existing Springhill Transmission Substation, on heavy industrial land. The scoping report estimates the cost at between $130 million and $150 million. The nearest homes are 1.2 km away.

The scoping report is dated 12 Aug 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Next, the EIS is exhibited for public submissions, and the department then assesses it. The Minister or a delegate decides.

Battery power capacity
100 MWSpringhill Scoping Report
Battery storage capacity
200 MWhSpringhill Scoping Report
Capital investment (lower estimate)
$130MSpringhill Scoping Report
Capital investment (upper estimate)
$150MSpringhill Scoping Report
Battery units
40 battery unitsSpringhill Scoping Report
Development footprint
0.71 haSpringhill Scoping Report
Distance to nearest homes
1.2 kmSpringhill Scoping Report

The department's description

Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 100 MW/200 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.