Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its HyKembla Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A hydrogen electrolyser plant at Port Kembla Steelworks

BlueScope proposes a hydrogen electrolyser plant on the Port Kembla Steelworks and the adjacent Springhill site, in the Wollongong City area. Stage 1 is a 10 MW electrolyser with hydrogen storage, pipework and a hydrogen refuelling station for trucks. Stage 2 would add up to 30 MW, for a combined 50 MW at most. The hydrogen is for trials in a blast furnace, for blending into natural gas and for heavy vehicles. No capital investment or job numbers are stated.

The proponent's scoping report was submitted on 7 Jul 2022 to request the Secretary's environmental assessment requirements (SEARs), and advice from the council and Transport for NSW on them is listed. The case is now at the stage where the proponent prepares its environmental impact statement (EIS). Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet.

Stage 1 electrolyser capacity
10 MWHyKembla Scoping Report
Stage 2 additional capacity
30 MWHyKembla Scoping Report
Maximum combined input capacity
50 MWHyKembla Scoping Report
Refuelling station: trucks a day
100 trucksHyKembla Scoping Report

The department's description

The development involves the construction and operation of a hydrogen electrolyser plant and associated infrastructure for use within existing iron and steel making processes at the Port Kembla Steelworks and hydrogen refuelling station.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.