On the map
State significant development

Illawarra Firming Power Station

A 300 to 400 MW gas power station at Unanderra

Under way: at prepare eisEnergy: otherDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 to 400 MW gas power station at Unanderra

The proponent proposes a gas turbine firming power station with a capacity of about 300 to 400 MW at 23 Glastonbury Avenue, Unanderra, in the Wollongong City Council area, about 6 km south of Wollongong. It would use a 6.8 ha part of a lot zoned for heavy industry, next to an existing substation, and connect to an existing gas pipeline. It would also include fuel oil storage, water tanks, a control building and a switchyard. The proponent's scoping report estimates a development cost of more than $30 million.

The proponent lodged a scoping report dated 25 Mar 2026 and asked for the Secretary's environmental assessment requirements (SEARs). The SEARs have been issued, with advice from several agencies. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS would be exhibited and the public could make submissions. No submissions have been made so far.

Power capacity
400 MWPortal page
Leased project site area
6.8 haScoping Report
Estimated development cost (more than)
$30MScoping Report

The department's description

Development of a 300 - 400 MW gas turbine firming power station and associated infrastructure, including turbine control units, gas and transmission line connections, fuel oil storage, water infrastructure and administrative facilities.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.