Site R3 - Macarthur Gardens North, Affordable Housing
130 affordable homes at Macarthur Gardens North, Campbelltown
Where it is in the process
Approved on 29 Apr 2026
What it proposes
AI summary. Written from this project's page and its SSD Instrument of Consent and SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
130 affordable homes at Macarthur Gardens North, Campbelltown
Landcom proposed two residential flat buildings, part 3 storey and part 9 storey, with 130 affordable apartments on Goldsmith Avenue, Campbelltown, in the Campbelltown council area. The site is next to Macarthur station. The estimated development cost is $103,491,570.60. It includes a basement car park with 63 car spaces. The buildings reach 35.6 m and 36.3 m, and 138 construction jobs are expected.
The environmental impact statement (EIS) was exhibited from 25 Sep 2025 to 22 Oct 2025 and drew 5 submissions: 1 objecting, 1 supporting and 3 commenting. The proponent responded on 19 Dec 2025. The department recommended approval, and its Director approved the project on 29 Apr 2026, as the Minister's delegate, with conditions. Next, the proponent must meet those conditions before building work starts.
- Estimated development cost
- $103.5MSSD-SSI Assessment Report
- Affordable apartments
- 130 dwellingsSSD Instrument of Consent
- Construction jobs
- 138 jobsSSD-SSI Assessment Report
- Car parking spaces
- 63 car spacesSSD Instrument of Consent
- Maximum height of Building B
- 36.3 mSSD-SSI Assessment Report
- Maximum height of Building A
- 35.6 mSSD-SSI Assessment Report
- Site area
- 4,895 m²SSD-SSI Assessment Report
The department's description
Construction of a residential flat building ranging from 3-9 storeys (maximum height of 32 m), comprising 130 affordable dwellings.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
5 submissions: 2 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Mod 1 - Site R3 Macarthur Gardens North, Affordable HousingSSD-80482713-Mod-1
Section 4.55(2) modification for revisions to the apartment mix and refinements to the building envelope including, reduction in building height, increased setbacks, basement design and façade articulation.
Its 37 documents
37 documents in 4 folders, each on the NSW Planning Portal
Modification Application23
Exhibition1
Response to Submissions12
Agency Advice1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
64 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
EIS36
- Appendix 10 - Solar Light Reflectivity Study
- Appendix 11 - Ecologically Sustainable Development Report
- Appendix 12 - BDAR wavier request
- Appendix 14 - BASIX Certificate
- Appendix 15 - Transport Impact Assessment
- Appendix 16 - Preliminary Geotechnical Assessment
- Appendix 17 - Pedestrian wind Environment Statement
- Appendix 18 - Contamination Assessment
- Appendix 19 - Contamination
- Appendix 2 - SEARs requirements
- Appendix 20 - Proposed amendment to Condition 1
- Appendix 21 - Mitigation measures table
- Appendix 22 - Engagement Outcomes Report
- Appendix 23 - Integrated Water Management Plan
- Appendix 24 - Social Impact Assessment
- Appendix 25 - C&D WMP
- Appendix 26 - OWMP
- Appendix 27 - Accessibility Assessment Report
- Appendix 28 - Aboriginal Heritage Advice
- Appendix 29 - Flood Compliance Letter
- Appendix 3 - Strategic planning assessment
- Appendix 30 - Acoustic Report
- Appendix 31 - CPTED Report
- Appendix 32- Bushfire Report
- Appendix 33 - BCA Report
- Appendix 34 - Fire Engineering Statement
- Appendix 4 - Macarthur Gardens North Planning Agreement
- Appendix 5 - Architectural Plans
- Appendix 6 - Design Report
- Appendix 7 - Structural Engineering Report
- Appendix 8 - Landscape Report
- Appendix 9 - Statutory compliance tables
- Appendix+13+-+Letter+of+Intent_
- BDAR Waiver
- Estimated Development Cost Letter
- PUBLIC - KEYLAN MGN Site R3 EIS (2)
Response to Submissions16
- 251219 KEYLAN Final MGN RTS
- Appendix 1 - Updated Landscape Report
- Appendix 10 - Updated ESD Report
- Appendix 11 - Driveway Long Section
- Appendix 12 - Updated Traffic Report
- Appendix 2 - Aboriginal Heritage Advice Letter
- Appendix 3 - Updated OWMP
- Appendix 4 - Compliance assessment
- Appendix 5 - Updated Flood Compliance Letter
- Appendix 6 - Updated Architectural Plans
- Appendix 7 - Updated Design Report
- Appendix 8 - Updated BASIX
- Appendix 9 - Updated NatHERS & Section J
- Bushfire Protection Assessment
- RTS - Response to NSW RFS comments
- Request RTS Letter
Agency Advice5
Additional Information1
What's near it
Where it is
- Suburb
- Campbelltown
- Council area
- Campbelltown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.