Residential development with infill affordable - Botany and Wallace Street, Kingsford
An 8 to 9 storey apartment building at Botany Street, Kingsford
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its 118-112 Botany St_SSD_Amended_Scoping Report_17.10.25 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
An 8 to 9 storey apartment building at Botany Street, Kingsford
The proponent proposes an apartment building of eight to nine storeys at 118-124 Botany Street and 58-60 Wallace Street, Kingsford, in the Randwick City area. The early scoping report described about 141 apartments, with 15% of the floor area as affordable housing for 15 years, plus a 3% affordable housing contribution. It also described basement parking for about 102 cars on a site of about 3,939.95 m², with a building up to about 28.6 m high. The final design may differ, and no capital investment is stated.
The case is at the response to submissions stage. The environmental impact statement (EIS) was exhibited from 9 September, and the portal's description gives no year. It drew 131 submissions: 118 objecting, 9 supporting and 4 commenting. The department has asked the proponent to respond to them. Next, the proponent responds, possibly amending the project. The department then assesses it and prepares a recommendation before a decision.
- Apartments (scoping report)
- 141 dwellings118-112 Botany St_SSD_Amended_Scoping Report_17.10.25
- Site area
- 3,939.95 m²118-112 Botany St_SSD_Amended_Scoping Report_17.10.25
- Basement car spaces (approximate)
- 102 car spaces118-112 Botany St_SSD_Amended_Scoping Report_17.10.25
- Maximum building height (scoping report)
- 28.6 m118-112 Botany St_SSD_Amended_Scoping Report_17.10.25
- Submissions received
- 131 submissionsPortal page
- Submissions objecting
- 118 submissionsPortal page
The department's description
Construction of eight-nine storey residential flat building
Exhibition period: 9 September - 23 September
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
131 submissions: 128 from the public and 3 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
51 documents in 7 folders, each on the NSW Planning Portal
Early Consultation2
Notice of Exhibition1
Request for SEARs1
EIS41
- Appendix A - SEARs Table
- Appendix AA - BASIX and NatHERS Report
- Appendix B - Statutory Compliance Table
- Appendix BB - BASIX Certificate
- Appendix C - Mitigation Measures Table
- Appendix CC - NatHERS Certificate
- Appendix D - Community Consultation Table
- Appendix DD - Arboricultural Impact Assessment
- Appendix E - Clause 4.6 Variation Request - Building Height
- Appendix EE - BDAR Waiver Request
- Appendix F - Engagement Report
- Appendix FF - BDAR Waiver
- Appendix G - Survey Plan
- Appendix GG - C & D Waste Management Plan
- Appendix H - Architectural Plans
- Appendix HH - Operational Waste Management Plan
- Appendix I - Architectural Design Report
- Appendix II - ACHAR
- Appendix J - Landscape Plans
- Appendix JJ - Aviation Impact Assessment Report
- Appendix K - BCA & Access Compliance Report
- Appendix KK - Affordable Housing Letter of Support
- Appendix L - Transport Impact Assessment
- Appendix LL - EDC and Employment Report Part 1
- Appendix M - PCTMP
- Appendix MM - Walking Distance Survey
- Appendix N - Acoustic Assessment
- Appendix O - Flood Impact and Risk Assessment
- Appendix P - Integrated Water Management Plan
- Appendix Q - Civil & Stormwater Drawings
- Appendix R - Consultant Advice - Hydraulic - Authority
- Appendix R - Geotechnical Investigation Report
- Appendix S - Detailed Site Investigation
- Appendix T - Remediation Action Plan
- Appendix U - Groundwater Impact Assessment
- Appendix V - Dewatering Management Plan
- Appendix W - Groundwater Inflow Assessment
- Appendix X - Groundwater Seepage Modelling
- Appendix Y - Groundwater Monitoring Report
- Appendix Z - ESD Report
- _25202 - 118-124 Botany Street
Response to Submissions1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.