On-Campus Student Accommodation at University of New South Wales
On-campus student housing at 39 Barker Street, Kensington
Where it is in the process
At exhibition, since 12 Nov 2026
Open for comment until 26 Nov 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its UNSW N13 Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
On-campus student housing at 39 Barker Street, Kensington
The University of New South Wales proposes to demolish existing accommodation at 39 Barker Street, Kensington, in the Randwick City area, and build three buildings across 5 colleges. The portal describes 766 on-campus student beds and 15 non-student accommodation units, with communal services and shared amenities. The original environmental impact statement (EIS) gave 732 beds and 30 non-student units. Tree removal is also proposed. No capital investment is stated.
The EIS was exhibited from 12 Nov 2026 to 26 Nov 2026 and has drawn 6 submissions so far: 1 objecting, 3 supporting and 2 commenting. The proponent has already responded to submissions and amended the project. Next, the department assesses the proposal with advice from other agencies, and then it is decided. The department's assessment report is not yet available.
- Student accommodation beds
- 766 bedsPortal page
- Non-student accommodation units
- 15 unitsPortal page
- Colleges
- 5 collegesPortal page
- Submissions
- 6 submissionsPortal page
The department's description
Demolition works, tree removal and construction of three buildings, delivering 766 on-campus student accommodation beds across 5 colleges, together with 15 non-student accommodation units, communal services and shared amenities.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
6 submissions: 3 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
75 documents in 10 folders, each on the NSW Planning Portal
Early Consultation1
Notice of Exhibition2
Request for SEARs1
Development Application1
EIS33
- Appendix A - SEARs Compliance Table
- Appendix AA - ACHAR (redacted)
- Appendix B - Statutory Compliance Table
- Appendix BB - Preliminary Aeronautical Impact Assessment
- Appendix C - Mitigation Measures
- Appendix CC - BCA Report
- Appendix D - Community Consultation Table
- Appendix E - Survey Plan
- Appendix F - Architectural Plans
- Appendix G - Design Report
- Appendix H - Clause 4.6 Variation Request
- Appendix I - Connecting with Country Strategy
- Appendix J - Landscape Plans
- Appendix K - Landscape Report
- Appendix L - Operational Management Plan
- Appendix M - Engagement Report
- Appendix N - Wind Assessment Report
- Appendix O - Arboricultural Impact Assessment
- Appendix P - Traffic Impact Assessment
- Appendix Q - ESD Report and NABERs
- Appendix R - Noise and Vibration Management Plan
- Appendix S - Integrated Water Management Report
- Appendix T - Flood Risk Assessment
- Appendix U - Preliminary Geotechnical Investigation Report
- Appendix V - Preliminary Site Investigation
- Appendix W - Detailed Site Investigaiton
- Appendix X - Hazardous Building Materials Survey
- Appendix Y - BDAR Waiver
- Appendix Z - Waste Management Plan
- Application_20260115063742
- Site Map
- UNSW N13 EDC Report_Part 1
- UNSW N13 Environmental Impact Statement
Response to Submissions17
- Appendix A - Submissions Register
- Appendix B - Updated Project Description
- Appendix C - Updated Mitigation Measures
- Appendix D - Amended Architectural Plans
- Appendix E - Architectural Response Pack
- Appendix F - Landscape Response
- Appendix G - Updated Operational Management Plan
- Appendix H - Fire Safety Compliance Letter
- Appendix I - Section J Compliance Letter
- Appendix J - Waste Response Letter
- Appendix K - Flood Response Letter
- Appendix L - Transport Response Letter
- Appendix M - Updated BCA Report
- Appendix N - Updated ACHAR
- Appendix O - BCA Response Letter
- Request RTS Letter
- Response to Submissions and Amendments Report
Agency Advice8
Amendments3
What's near it
Where it is
- Suburb
- Kensington
- Council area
- Randwick
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.