UNSW G25 Education Building
A 13-storey teaching building at UNSW, Kensington
Where it is in the process
Approved on 4 Feb 2026
What it proposes
AI summary. Written from this project's page and its SSD-74670005 - Assessment Report and SSD-74670005 - Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 13-storey teaching building at UNSW, Kensington
The University of New South Wales proposed a 13-storey teaching and learning building, including lower ground and rooftop plant levels, at 8 High Street, Kensington, in the Randwick City Council area. It would replace an at-grade car park with 64 spaces on the Kensington campus. The department says it would create five new operational jobs. The estimated development cost is not readable in the text.
The environmental impact statement (EIS) was exhibited from 23 April to 20 May. The case drew 26 submissions: 23 objecting and 3 commenting. The proponent responded on 5 Nov 2025 and reduced the scope of the application on 8 Jan 2026. The department recommended approval, and its Executive Director approved the project on 4 Feb 2026 as the Minister's delegate. Next, the proponent must meet the consent's conditions, including management plans, before construction.
- Building height
- 13 storeysSSD-74670005 - Development Consent
- Existing car park spaces on the site
- 64 car spacesSSD-74670005 - Assessment Report
- Campus area
- 38 haSSD-74670005 - Assessment Report
The department's description
Minor demolition works and construction of a new teaching and learning building at location G25.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
26 submissions: 24 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
UNSW G25 Mod-1 - Building G25 minor design changesSSD-74670005-Mod-1
Minor design changes including changes to internal layouts, materials, landscaping and public domain design.
Its 19 documents
19 documents in 4 folders, each on the NSW Planning Portal
Modification Application10
Additional Information5
Determination3
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
113 documents in 12 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
SEARs2
EIS44
- Appendix A - SEARs Compliance Table
- Appendix AA - Social Impact Assessment
- Appendix B - Mitigation Measures
- Appendix BB - Electrical Services Infrastructure Report
- Appendix C - Statutory Compliance Table
- Appendix CC - Hydraulic Services Infrastructure Report
- Appendix D - Architectural Plans
- Appendix DD - Aeronautical Impact Assessment
- Appendix E - Design Report
- Appendix EE - Consultation Outcomes Report
- Appendix F - Landscape Design Report
- Appendix FF - Long Term Environmental Management Plan
- Appendix GG - Civil Design Report Part 1
- Appendix GG - Civil Design Report Part 2
- Appendix H - BCA & DDA Assessment Report
- Appendix HH - Construction Waste Management Plan
- Appendix I - Wind Assessment
- Appendix II - CNVMP
- Appendix J - Visual Impact Assessment
- Appendix JJ - EIS Summary
- Appendix K - CPTED Report
- Appendix L - Arboricultural Impact Assessment
- Appendix M - ESD Report
- Appendix M - ESD Report (Part 2)
- Appendix N - Transport Impact Assessment
- Appendix O - BDAR Waiver
- Appendix P - Operational Noise and Vibration Assessment
- Appendix Q - Construction Management Plan
- Appendix R - Geotechnical Report
- Appendix S - Surface and Groundwater Impact Assessment
- Appendix T - Risk Screening
- Appendix U - H25 Lift Structural Statement
- Appendix V - Remediation Action Plan
- Appendix W - Contamination Investigation Part 1
- Appendix W - Contamination Investigation Part 2
- Appendix X - Operational Waste Management Plan
- Appendix Y - Heritage Impact Statement
- Appendix Z - ACHAR Redacted Part 1
- Appendix Z - ACHAR Redacted Part 2
- Application_20250313063652
- NABERS Form - Refer to ESD Report Appendix B
- NetZeroStatement - Refer to ESD Report
- Owners Consent G25 SSDA
- UNSW G25 - Environmental Impact Statement
Response to Submissions17
- Appendix A - Submissions Register
- Appendix B1 - Detailed Response to Submissions Table
- Appendix B2 - Detailed RtS Table_Additional Comments
- Appendix C - Amended Architectural Plans
- Appendix D - Design Report Addendum
- Appendix E - Amended Landscaping Plans
- Appendix F - Pedestrian Wind Environment Assessment
- Appendix G - Social Impact Assessment Addendum Report
- Appendix H - Civil Design Addendum Letter
- Appendix I - Visual Impact Assessment Addendum Report
- Appendix J - Community Submissions Responses
- Appendix K - Aircraft Controlled Activity Approval
- Appendix L - UNSW Emergency Response Plan
- Appendix M - Construction Worker Transport Strategy
- Appendix N - Parking Plan
- Request RtS Letter
- _Response to Submissions Report
Agency Advice8
Amendments8
Additional Information21
- Appendix B - Revised Architectural Drawings
- Appendix C - Revised Landscape Site Plan
- Appendix D - WSUD Statement
- Appendix E - Wind Mitigation Addendum Letter
- Appendix F - Revised NVIA Report
- Appendix G - Cumulative CNAVIA Report
- Appendix H - Gate Entry Markers Concept 01
- Appendix I - Additional Solar Assessment - 107 Botany Road
- Appendix J - Flooding Addendum Memo
- Appendix J - Revised Flooding Addendum Report
- Appendix K - Revised EDC Report
- Appendix L - SEPP (IE) 2021 Assessment
- Appendix M - Construction Worker Transport Strategy
- Appendix M - UNSW Letter - Development Contributions
- Appendix N - Gate 11 Signage Location
- CPHR Advice on RtS
- Randwick Council Advice on RtS
- Request for Additional Information
- Response to RFI - 17 December 2025
- Response to RFI Addendum - 13 January 2026
- UNSW G25 Amendment Report - Error Corrected
Determination4
Management Plans and Strategies4
Independent Reviews and Audits1
Notifications1
What's near it
Where it is
- Suburb
- Kensington
- Council area
- Randwick
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.