On the map
State significant development

Project Velocity – Precinct 4 (Stage 1)

A warehouse and site works at Elizabeth Drive, Luddenham

Under way: at prepare eisIndustry and warehousesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report - Project Velocity - Precinct 4 (Stage 1) on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A warehouse and site works at Elizabeth Drive, Luddenham

The proponent proposes site-wide preparation works, infrastructure works and subdivision, and the construction and operation of a warehouse and distribution centre on Lot 1. The site is at 2207-2287 Elizabeth Drive, Luddenham, in the Penrith council area, near the Western Sydney International Airport. It covers about 77.25 ha and is part of a larger 193 ha group of landholdings called Project Velocity. No capital investment, building size or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated 18 Jun 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. No public submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited so the public can make submissions. The department then assesses the project and decides it.

Site area
77.25 haScoping Report - Project Velocity - Precinct 4 (Stage 1)
Project Velocity total land area
193 haScoping Report - Project Velocity - Precinct 4 (Stage 1)

The department's description

The proposed development comprises site-wide preparation works, infrastructure works and subdivision, as well as construction and operation of a warehouse and distribution centre on Lot 1.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.