On the map
State significant development

Ferndale Industrial Precinct - Stages 2 and 3

Two warehouses at Ferndale Industrial Precinct, Luddenham

Under way: at prepare eisIndustry and warehousesLocal scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Two warehouses at Ferndale Industrial Precinct, Luddenham

The proponent proposes two warehouse and distribution centres with ancillary offices at 275 Adams Road, Luddenham, in the Liverpool City Council area. They are Stages 2 and 3 of the Ferndale Industrial Precinct, on about 4 ha of a former shale quarry site in the Western Sydney Aerotropolis. One warehouse would have a floor area of 6,580 m² and the other 10,800 m². The proposal also includes a public collector road 25.6 m wide, about 122 car spaces and subdivision if required. No capital investment is stated.

The proponent lodged a scoping report on 17 Oct 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The case is at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. None have been made yet. The department then assesses the project.

Northern warehouse floor area
6,580 m²Scoping Report
Southern warehouse floor area
10,800 m²Scoping Report
Car parking spaces
122 car spacesScoping Report
Public collector road width
25.6 mScoping Report
Development area, Stages 2 and 3
4 haScoping Report
Whole site area
19.1 haScoping Report

The department's description

Construction and operation of two warehouse and distribution centres with ancillary office space; site preparation works and and bulk earthworks; construction of roads, stormwater infrastructure and services; and subdivision

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.