Project Pluto Data Centre
A 100 MW data centre at McCredie Road, Guildford West
Where it is in the process
Approved on 23 Jul 2026
What it proposes
AI summary. Written from this project's page and its Signed - SSD Instrument of Consent and Signed - SSD-SSI Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 100 MW data centre at McCredie Road, Guildford West
The project is a data centre at 132 McCredie Road, Guildford West, in the Cumberland area, on about 7.17 ha of industrial land. It has nine data halls over two storeys, a gross floor area of 29,444 m² and a maximum height of 25.77 m. Total power use is 100 MW, with back-up diesel generators and lithium-ion batteries. The estimated development cost is $1.1 billion, with up to 467 construction jobs and 60 operational jobs.
The environmental impact statement (EIS) was exhibited from 9 May 2025 to 6 Jun 2025. The portal counts 4 submissions, all comments, from 2 organisations and 2public authorities. The department's assessment found the project approvable, mainly on noise, air quality and design and visual impact. A director of the department, as the Minister's delegate, approved it on 23 Jul 2026 with conditions. Next, the proponent must meet those conditions before and during construction.
- Estimated development cost
- $1.11bnSigned - SSD-SSI Assessment Report
- Total power consumption
- 100 MWSigned - SSD-SSI Assessment Report
- Construction jobs
- 467 jobsSigned - SSD-SSI Assessment Report
- Operational jobs
- 60 jobsSigned - SSD-SSI Assessment Report
- Maximum building height
- 25.77 mSigned - SSD-SSI Assessment Report
- Gross floor area
- 29,444 m²Signed - SSD-SSI Assessment Report
- Site area
- 7.17 haSigned - SSD-SSI Assessment Report
The department's description
Construction and operation of a data centre with a load capacity of 100MW comprising of two, three-storey buildings, substations, ancillary office space, car parking, landscaping and demolition works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
4 submissions: 2 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
110 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS39
- Apendix FF - ACHAR (Redacted)
- Appendix A - SEARs Compliance Table
- Appendix AA - Contamination and Remediation Report
- Appendix B - Architectural Drawings
- Appendix BB - Waste Management plan
- Appendix C - Statutory Compliance Table
- Appendix CC - Hazardous Materials Survey
- Appendix DD - Dangerous Goods Report
- Appendix E - Community Engagement Report
- Appendix EE - SEPP Resilience and Hazards Risk Report
- Appendix F - Mitigation Measures Table
- Appendix GG - Historical Heritage Constraints Assessment
- Appendix H - Architectural Design Report
- Appendix HH - Social Impact Assessment
- Appendix I - Survey Plan
- Appendix II - Infrastructure Report
- Appendix J - Landscape Plans
- Appendix JJ - Cooling System Options Analysis
- Appendix K.1 - Landscape Management Plan
- Appendix K.2 - Landscape Management Plan
- Appendix KK - AIA
- Appendix L - BCA Report
- Appendix LL - Fire Safety Concept Strategy
- Appendix M - Accessibility Report
- Appendix N - Visual Impact Assessment
- Appendix O - Traffic Report
- Appendix P - ESD Report
- Appendix Q - Embodied Emissions Material Report
- Appendix R - NABERS Agreement to Rate
- Appendix S - BDAR
- Appendix T - Air Quality
- Appendix U - Noise & Vibration Impact Assessment
- Appendix V - Ground and Water Conditions Letter
- Appendix W - Salinity Management Plan
- Appendix X - Integrated Water Management Plan
- Appendix Y - Civil Engineering Package
- Appendix Z - Flood Impact Assessment
- Application_20250428064159
- Project Pluto - Environmental Impact Statement
Response to Submissions20
- Annexure P - Survey - Stormwater CCTV Report
- Appendix A - Submissions Register
- Appendix B - List of Plans for Approval
- Appendix C - Updated Architectural Plans
- Appendix D - Updated Design Report
- Appendix E - Updated Visual Impact Assessment
- Appendix F - Updated Traffic Impact Assessment
- Appendix G - Updated integrated Water Management Plan
- Appendix H - Updated Landscaping Plans
- Appendix I - Updated Landscaping Report
- Appendix J - Updated Noise and Vibration Impact Assessment
- Appendix K - Updated ACHAR Redacted
- Appendix L - Updated Air Quality Impact Assessment
- Appendix M - Updated Flood Risk Assessment
- Appendix N - Updated Civil Drawings
- Appendix O - Updated ESD Report
- Appendix Q - Updated Infrastructure Report
- Appendix R - Mitigation Measures Table
- Project Pluto - RTS Report
- Request RTS Letter
Agency Advice17
- CPHR advice on EIS
- Cumberland Council - Submission on EIS
- EPA - Advice on EIS
- FCC - Submission on the EIS
- FRNSW - Advice on EIS
- HNSW ACH - Advice on EIS
- Jemena - Advice on EIS
- RTS - CPHR Advice Part 1
- RTS - CPHR Advice Part 2
- RTS - Council Response
- RTS - EPA Advice
- RTS - FRNSW Advice
- RTS - Heritage NSW ACH Advice
- RTS - TfNSW Advice
- Sydney Water - Advice on EIS
- Sydney Water DA Information Sheet (Feb 2025)
- TfNSW - Advice on EIS
Additional Information26
- Appendix A - Response to Submissions Table
- Appendix A - Response to Submissions Table
- Appendix A - Response to Submissions Table
- Appendix B - Flood Impact and Risk Assessment (Updated)
- Appendix B - Flood Impact and Risk Assessment (Updated)
- Appendix B - Noise and Vibration Assessment (Updated)
- Appendix C - Holroyd City Council Flood Study
- Appendix C - Swept Path Analysis (Updated)
- Appendix C - Water Cycle Management Plan (Updated)
- Appendix D - Architectural Drawings (Updated)
- Appendix D - Civil Drawings (Updated)
- Appendix E - Civil Drawings (Updated)
- Appendix E - Landscaping Report (Updated)
- Appendix F - Landscape Drawings (Updated)
- Appendix F - Landscaping Drawings (Updated)
- Appendix G - Architectural Landscaping Drawings (Updated)
- Appendix G - Endeavour Energy Letter of Support
- Pluto - RTS Cover Letter
- Pluto - RTS Cover Letter
- Pluto - RTS Cover Letter_Table
- RFI - Response to CPHR Group Advice
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information Final
- Submissions Report - CPHR Advice
- _CPHR+Advice+Letter++-+SSD-69223466_
What's near it
Where it is
- Suburb
- Smithfield
- Council area
- Cumberland
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.