Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Guildford West HV BESS - Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 85 MW battery on McCredie Road, Guildford West

The proponent proposes a battery energy storage system with a capacity of up to 85 MW and 340 MWh, made up of 60 lithium-ion battery containers. It would sit within the existing Guildford West substation site at 120-130 McCredie Road, Guildford West, in the Cumberland council area. The development footprint is about 2.31 ha, with seven noise walls 5 m high. The environmental impact statement (EIS) gives an estimated cost of about $100 million. Construction would take about 15 months, with up to 40 workers at peak.

The case is at the response to submissions stage, after the EIS was exhibited. It has drawn 3 submissions: 1 supporting and 2 commenting. No exhibition dates or response date are stated. Next, the proponent responds to the submissions, and the department then assesses the project. The Minister or the department's delegate decides it. No decision has been made.

Capital investment
$100MGuildford West HV BESS - Environmental Impact Statement
Battery power capacity
85 MWGuildford West HV BESS - Environmental Impact Statement
Battery storage capacity
340 MWhPortal page
Battery containers
60 containersGuildford West HV BESS - Environmental Impact Statement
Development footprint
2.31 haGuildford West HV BESS - Environmental Impact Statement
Peak construction workforce
40 workersGuildford West HV BESS - Environmental Impact Statement
Construction period
15 monthsGuildford West HV BESS - Environmental Impact Statement

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 85 MW/340 MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

3 submissions: 2 from the public and 1 from public authorities

Object0
Support1
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.