On the map
State significant development

Penrith Waste Recycling and Transfer Facility

Decided: approved on 15 May 2020Waste

Where it is in the process

Approved on 15 May 2020

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination15 May 2020 (done)
  9. Approved15 May 2020

What it proposes

The department's description

Construction and operation of a waste transfer station with a capacity of up to 180,000 tonnes per annum (tpa) of general solid (non‐putrescible waste), including sorting, storage and dispatch of materials to other facilities.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

36 submissions: 21 from the public and 15 from organisations

Object27
Support0
Comment9

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Penrith Resource Recovery Facility MOD 3 - DesignSSD-7733-Mod-3

Decided: approved on 2 Oct 2025 by the department (team leader)

Proposes raising wall heights, lowering and flattening the roof pitch, enlarging weighbridge offices with added levels for a water tank (replacing the underground tank) and a pump room, and extending the outgoing weighbridge office.

Its 10 documents

10 documents in 4 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Penrith Resource Recovery Facility MOD 2 - SafetySSD-7733-Mod-2

Decided: approved on 19 Dec 2024 by the department (team leader)

Updated fire compliance requirements led to adjustments, including modifying weighbridges and offices to allow fire exits at the street frontage. These changes improved safety, traffic flow, rainwater capture, and operational efficiency.

Its 22 documents

22 documents in 5 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice8

See the 8 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Penrith Resource Recovery Facility MOD 1 - Change in building materialSSD-7733-Mod-1

Decided: approved on 5 May 2021 by the department (team leader)

Change in building material for external walls from partly colorbond metal to full-height masonry walls

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.