Penrith Waste Recycling and Transfer Facility
Where it is in the process
Approved on 15 May 2020
What it proposes
The department's description
Construction and operation of a waste transfer station with a capacity of up to 180,000 tonnes per annum (tpa) of general solid (non‐putrescible waste), including sorting, storage and dispatch of materials to other facilities.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
36 submissions: 21 from the public and 15 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
3 changes to the project after its decision, each assessed as a case of its own, newest first.
Penrith Resource Recovery Facility MOD 3 - DesignSSD-7733-Mod-3
Proposes raising wall heights, lowering and flattening the roof pitch, enlarging weighbridge offices with added levels for a water tank (replacing the underground tank) and a pump room, and extending the outgoing weighbridge office.
Its 10 documents
10 documents in 4 folders, each on the NSW Planning Portal
Modification Application2
Agency Advice5
Determination2
Consolidated Consent1
Penrith Resource Recovery Facility MOD 2 - SafetySSD-7733-Mod-2
Updated fire compliance requirements led to adjustments, including modifying weighbridges and offices to allow fire exits at the street frontage. These changes improved safety, traffic flow, rainwater capture, and operational efficiency.
Its 22 documents
22 documents in 5 folders, each on the NSW Planning Portal
Modification Application6
Agency Advice8
Additional Information5
Determination2
Consolidated Consent1
Penrith Resource Recovery Facility MOD 1 - Change in building materialSSD-7733-Mod-1
Change in building material for external walls from partly colorbond metal to full-height masonry walls
Its 4 documents
4 documents in 3 folders, each on the NSW Planning Portal
Modification Application1
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
26 documents in 8 folders, each on the NSW Planning Portal
Request for SEARs1
Response to Submissions2
Additional Information8
Recommendation2
Determination3
Management Plans and Strategies5
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.