On the map
State significant development

Orana Wind Farm

Orana Wind Farm, 92 turbines south of Dunedoo

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Orana Wind Farm, 92 turbines south of Dunedoo

The proponent proposes a wind farm of up to 92 turbines, with an estimated capacity of approximately 524 megawatts, about 3 km south of Dunedoo. It sits across the Warrumbungle Shire and Mid-Western Regional council areas, in the Central-West Orana Renewable Energy Zone. It would also include up to two battery systems of up to 100 MW and 200 MWh, up to three substations, and turbines with a tip height of up to 271.5 m. Up to 580 full-time employees would be needed at peak construction and about 12 in operation. No capital investment figure is stated beyond "over $30 million".

The proponent lodged a scoping report dated March 2023 and the Secretary's environmental assessment requirements (SEARs) have been issued. The case is at the stage where the proponent prepares its environmental impact statement (EIS), so there are no public submissions yet. Next, the EIS is exhibited and the public can make submissions. The department then assesses the project.

Wind turbines
92 turbinesScoping Report
Wind farm capacity
524 MWScoping Report
Maximum turbine tip height
271.5 mScoping Report
Battery power capacity
100 MWScoping Report
Battery storage
200 MWhScoping Report
Peak construction jobs
580 jobsScoping Report
Operational jobs
12 jobsScoping Report

The department's description

Construction and operation of a wind farm with up to 92 wind turbines, battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.