A 700 MW solar farm and battery at Cobbora

Under way: at assessmentEnergy: solarRegional scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Cobbora Solar Farm EIS and App A-E on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 700 MW solar farm and battery at Cobbora

The proponent seeks consent for a solar farm of up to 700 MW with a 400 MW / 1,600 MWh battery energy storage system, at 1050 Spring Ridge Road, Cobbora, about 20 km south-west of Dunedoo and 55 km east of Dubbo. The development footprint is about 1,600 ha. The environmental impact statement (EIS) gives an estimated cost of $1.38 billion, up to 734 construction workers at peak and 20 operational workers.

The EIS is dated 31 Jul 2025. The case drew 71 submissions: 67 objecting, 2 supporting and 2 commenting. The proponent responded to submissions and lodged an amendment report. The case is now at the More Information Required stage, so the department has asked for more information. No date is given for this stage. Next, the department continues its assessment and then issues an assessment report before a determination.

Solar farm capacity
700 MWPortal page
Battery power capacity
400 MWCobbora Solar Farm EIS and App A-E
Battery storage capacity
1,600 MWhCobbora Solar Farm EIS and App A-E
Estimated cost of development
$1.38bnCobbora Solar Farm EIS and App A-E
Peak construction workers
734 jobsCobbora Solar Farm EIS and App A-E
Operational workers
20 jobsCobbora Solar Farm EIS and App A-E
Development footprint
1,600 haCobbora Solar Farm EIS and App A-E

The department's description

Development of a 700 MW solar farm with energy storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

71 submissions: 57 from the public, 11 from organisations and 3 from public authorities

Object67
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

84 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs5
EIS14
Response to Submissions7
Agency Advice38
Amendments17
Additional Information1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.