Avonside Solar Farm

A 180 MW solar farm and battery at Avonside Road, Dunedoo

Under way: at sears expiredEnergy: solarDistrict scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Avonside Solar - Issued SEARs on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 180 MW solar farm and battery at Avonside Road, Dunedoo

The proposal is a solar farm with a capacity of 180 MW and a battery energy storage system at 1784 Avonside Road, Dunedoo, in the Warrumbungle Shire. The portal describes the battery as 400 MW capacity with 400 MWh of storage. The environmental assessment requirements describe battery storage of up to 180 MW / 400 MWh. The site is about 13 km south of Dunedoo. No capital investment or job numbers are stated.

The Secretary's environmental assessment requirements (SEARs) were issued on 24 Jan 2024. They say the proponent must lodge an application and environmental impact statement (EIS) within 2 years or the SEARs expire. The portal now shows the SEARs as expired, and no EIS has been lodged. There have been no submissions. Without a new request, the case cannot go on to exhibition or assessment.

Solar farm capacity
180 MWAvonside Solar - Issued SEARs
Battery energy storage
400 MWhAvonside Solar - Issued SEARs
Battery capacity (portal description)
400 MWPortal page

The department's description

180MW Solar Farm and 400MW capacity Battery Energy Storage System with 400MWh storage.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.